Formation Treatment |
Treatment Type: | |
Treatment Date: | 5/9/2017 | Treatment End Date: | N/A |
Treatment Summary: | pumped 4000 gallons 15% HCl, with 80 bbls fresh water.
first injection 7/19/1985 |
Total fluid used in treatment (bbls): | 175 | Max pressure during treatment (psi): | |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 80 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 5/15/2015 | Treatment End Date: | 5/15/2015 |
Treatment Summary: | PUMPED 4000 GALLONS 15% HCL. |
Total fluid used in treatment (bbls): | 172 | Max pressure during treatment (psi): | 2300 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 92 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 80 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Date: | 8/7/2009 |
Treatment Summary: | ACID STIMULATION 8/7/09 PUMPED 2000 GALS 20% HCI & 10,500 GALS CHLORINE DIOXIDE IN FOUR STAGES THROUGH TUBING AT 6314. AVERAGE 3.9 BPM @ AVERAGE 2250 PSI. |