Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-06148
Well Classification: ERIW Status: IJ - 8/29/2022
Well Name/No:FEE #64
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:SCOUT ENERGY MANAGEMENT LLC - 10779
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:47443
Facility Status:IJStatus Date8/29/2022
FacilityID:229070LocationID:314575
County:RIO BLANCO #103Location:SENE 19 2N102W 6
Field:RANGELY - #72370Elevation:5315 ft.
Planned Location:1980FNL  660 FELLat/Long: 40.130375 / -108.879106Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.130350 / -108.879047Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: DSPW             Status: IJ - 8/29/2022             Measured TD: 6533 ft.    Vertical TD: 6533 ft.

 Wellbore Data for Original WellboreWellbore Classification: DSPW        IJ - 8/29/2022
Wellbore Permit
Permit #:10001 Expiration Date:12/23/1977
Prop Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: 0 , Unit Acreage: 0, Drill Unit:

Wellbore Completed
Completion Date:10/22/1977
Measured TD:6533 ft.Measured PB depth:0 ft.
True Vertical TD:6533 ft.True Vertical PB depth:
Casing:String Type: SURF, Hole Size: , Size: 10.75 in., Top: 0 ft., Depth: 713 ft., Weight: , Citings Type: HISTORICAL
Cement:Sacks: 0, Top: 0 ft., Bottom: , Determination Method:
Casing:String Type: 1ST, Hole Size: , Size: 7 in., Top: 0 ft., Depth: 5974 ft., Weight: , Citings Type: HISTORICAL
Cement:Sacks: 0, Top: 0 ft., Bottom: , Determination Method:
Casing:String Type: 1ST LINER, Hole Size: 0 in., Size: 5 in., Top: 5810 ft., Depth: 6525 ft., Weight: , Citings Type: HISTORICAL
Cement:Sacks: 0, Top: 0 ft., Bottom: , Determination Method:

Formation WEBR                     Formation Classification:  ERIW                     Status:  IJ - 8/29/2022                 Interval Top: 5996 ft.    Interval Bottom: 6515 ft.

 Completed Information for Formation WEBER
1st Production Date:3/1/1948Choke Size: 
Formation Name:WEBERCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:8/26/2022Treatment End Date:8/26/2022
Treatment Summary:PUMPED 4000 GALLONS (95.2 BBLS) 15% HCL WITH MUTUAL SOLVENT, AND 65 BBLS FRESH WATER.
Total fluid used in treatment (bbls):160Max pressure during treatment (psi):1747
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):65Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:2/10/2019Treatment End Date:2/10/2019
Treatment Summary:PUMPED 2000 GALLONS 15% HCL WITH 110 GALLONS SOLVENT, 120 BBLS FRESH WATER.
Total fluid used in treatment (bbls):170Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):48Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):120Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:12/3/2016Treatment End Date:12/4/2016
Treatment Summary:PUMPED 4000 GALLONS 15% HCL AND 300 BBLS FRESH WATER
Total fluid used in treatment (bbls):395Max pressure during treatment (psi):1120
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):300Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:2/19/2016Treatment End Date:2/19/2016
Treatment Summary:PUMPED 2000 GALLONS 15% HCL AND 200 BBLS FRESH WATER
Total fluid used in treatment (bbls):248Max pressure during treatment (psi):2377
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):48Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):200Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.875 in.Tubing Setting Depth:5756 ft.
Tubing Packer Depth:5740 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WEBR.
Perforation Data:
Interval Top:5996 ft.# Of Holes:282
Interval Bottom:6515 ft.Hole Size:0.5 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
June 2023 - May 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)512977
GOR
GOR DeterminationMCFE
Average BOE per Day241.194
Average MCFE per Day1398.897

 Federal Financial Assurance  i 

 Tribal Well  i No