Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-05809
Well Classification: ERIW Status: IJ - 8/17/2023
Well Name/No:MCLAUGHLIN, A C #7
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:SCOUT ENERGY MANAGEMENT LLC - 10779
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:47443
Facility Status:IJStatus Date8/17/2023
FacilityID:228822LocationID:314483
County:RIO BLANCO #103Location:SWNE 14 2N103W 6
Field:RANGELY - #72370Elevation:5502 ft.
Planned Location:1980FNL  1980 FELLat/Long: 40.144765 / -108.921228Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.144635 / -108.921192Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OTH             Status: IJ - 8/17/2023             Measured TD: 6750 ft.

 Wellbore Data for Original WellboreWellbore Classification: OTH        IJ - 8/17/2023
Wellbore Permit
Permit #:10001 Expiration Date:2/24/2000
Prop Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEDERALSurface Owner:Not available
Unit: Unit Number:D-023675
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: 0 , Unit Acreage: 0, Drill Unit:

Wellbore Completed
Completion Date:6/1/1946
Spud Date:5/1/1946Spud Date Is:ACTUAL
Measured TD:6750 ft.Measured PB depth:6690 ft.
True Vertical TD:True Vertical PB depth:
Log Types:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 10.75 in., Top: 0 ft., Depth: 1018 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 350, Top: 0 ft., Bottom: 1018 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6398 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 1250, Top: 0 ft., Bottom: 6398 ft., Determination Method: CALC
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 1029 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 380, Top: , Bottom: 1029 ft., Determination Method: CALC
Casing:String Type: 1ST LINER, Hole Size: , Size: 4.5 in., Top: 0 ft., Depth: 6690 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 520, Top: 0 ft., Bottom: 6690 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
WEBER6388 ft.6750 ft.NN

Formation WEBR                     Formation Classification:  ERIW                     Status:  IJ - 8/17/2023                 Interval Top: 6496 ft.    Interval Bottom: 6572 ft.

 Completed Information for Formation WEBER
1st Production Date:6/1/1972Choke Size: 
Formation Name:WEBERCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:5/10/2023Treatment End Date:5/10/2023
Treatment Summary:WELLOWRK TO REPAIR WELL, ADDED WEBER ZONE 1 & 3 PERFORATIONS FROM 6582-6639 AND 6396-6468 @ 3 SPF 120 PHASING WITH 21 GRAM 44" SHOT PEN. PUMPED 26 BBLS 15% HCL IWTH MUTUAL SOLVENT AND 80 BBLS WATER. Return to injection pending an approved Form 21.
Total fluid used in treatment (bbls):106Max pressure during treatment (psi):1900
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):26Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):80Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:12/5/2022Treatment End Date:12/5/2022
Treatment Summary:PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL W/SOLVENT, 35 BBLS WATER
Total fluid used in treatment (bbls):83Max pressure during treatment (psi):2400
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):48Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):35Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:1/26/2022Treatment End Date:1/26/2022
Treatment Summary:PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL W/SOLVENT, 60 BBLS WATER
Total fluid used in treatment (bbls):107Max pressure during treatment (psi):2400
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):47Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):60Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:8/5/2020Treatment End Date:8/5/2020
Treatment Summary:PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL W/SOLVENT, 50 BBLS WATER
Total fluid used in treatment (bbls):98Max pressure during treatment (psi):2200
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):48Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):50Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:9/21/2019Treatment End Date:9/21/2019
Treatment Summary:PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL WITH 2.8 BBLLS 6% CITRIC ACID, 40 BBLS WATER
Total fluid used in treatment (bbls):90Max pressure during treatment (psi):2200
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):50Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):40Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:4/16/2010
Treatment Summary:ACID STIMULATION 4/16/2010 PUMPED 3000 GALLONS OF 20% HCI THROUGH END OF TUBING 6496' AT 1.2 BPM @ 300 PSI
Tubing Size:2.875 in.Tubing Setting Depth:6468 ft.
Tubing Packer Depth:6352 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WEBR.
Perforation Data:
Interval Top:6496 ft.# Of Holes:228
Interval Bottom:6572 ft.Hole Size:0.5 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
June 2023 - May 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)208282
GOR
GOR DeterminationMCFE
Average BOE per Day97.920
Average MCFE per Day567.944

 Federal Financial Assurance  i Y

 Tribal Well  i No