| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 12/2/2025 | Treatment End Date: | 12/2/2025 |
| Treatment Summary: | PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL W/SOLVENT AND 33 BBLS FRESH WATER
|
| Total fluid used in treatment (bbls): | 80 | Max pressure during treatment (psi): | 2511 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 33 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 5/23/2025 | Treatment End Date: | 5/23/2025 |
| Treatment Summary: | PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL W/SOLVENT AND 35 BBLS FRESH WATER |
| Total fluid used in treatment (bbls): | 82 | Max pressure during treatment (psi): | 2422 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 35 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 8/20/2024 | Treatment End Date: | 8/20/2024 |
| Treatment Summary: | Pumped 2000 gallons (47.6 bbls) 15% HCL w/solvent and 35 bbls Fresh water. |
| Total fluid used in treatment (bbls): | 82 | Max pressure during treatment (psi): | 2500 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 35 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 12/14/2023 | Treatment End Date: | 12/14/2023 |
| Treatment Summary: | Pumped 2000 Gallons (47.6 bbls) 15 % HCL with solvent and 120 bbls water. |
| Total fluid used in treatment (bbls): | 167 | Max pressure during treatment (psi): | 1900 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | 100 | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 120 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 10/6/2022 | Treatment End Date: | 10/6/2022 |
| Treatment Summary: | Pumped 2000 gallons (47.6 bbls) 15% HCL with mutual solvent and 35 bbls water. |
| Total fluid used in treatment (bbls): | 83 | Max pressure during treatment (psi): | 2400 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 48 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 35 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 12/9/2021 | Treatment End Date: | 12/9/2021 |
| Treatment Summary: | PUMPED 2000 BALLONS (47.6 BBLS) 15% HCL W/MUTUAL SOLVENT AND 63 BBLS FRESH WATER |
| Total fluid used in treatment (bbls): | 110 | Max pressure during treatment (psi): | 2200 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 63 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 6/30/2021 | Treatment End Date: | 6/30/2021 |
| Treatment Summary: | PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL W/MUTUAL SOLVENT, 45 BBLS WATER
|
| Total fluid used in treatment (bbls): | 92 | Max pressure during treatment (psi): | 2180 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 45 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 4/27/2020 | Treatment End Date: | 4/27/2020 |
| Treatment Summary: | Pumped 2000 gallons (47.6 bbls) of 15% HCL with 6% citric inhibitor with 60 bbls of fresh water.
|
| Total fluid used in treatment (bbls): | 107 | Max pressure during treatment (psi): | 2100 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 60 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 4/9/2020 | Treatment End Date: | 4/9/2020 |
| Treatment Summary: | Pumped 2000 gallons (47.6 bbls) 15% HCL and 70 bbls fresh water. |
| Total fluid used in treatment (bbls): | 117 | Max pressure during treatment (psi): | 1800 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 70 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 4/9/2019 | Treatment End Date: | 4/10/2019 |
| Treatment Summary: | Pumped 4000 gallons 15% HCL with 95 gallons solvent, 40 bbls fresh water. |
| Total fluid used in treatment (bbls): | 135 | Max pressure during treatment (psi): | 1910 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 40 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 3/19/2015 | Treatment End Date: | 3/19/2015 |
| Treatment Summary: | PUMPED 4000 GALLONS 15% HCL |
| Total fluid used in treatment (bbls): | 204 | Max pressure during treatment (psi): | 1200 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 112 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Date: | 4/13/2010 |
| Treatment Summary: | ACIDIZE FORMATION WITH 400 GALLSON HEATED 20% HCI, EOT @ 6700 STARTING 1.7 BPM @ 2200 PSI |
| Formation Treatment |
| Treatment Date: | 2/25/2009 |
| Treatment Summary: | ACIDIZE FORMATION W/4000 GALS HEATED 20% HCI, EOT @ 6700' |