| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 4/23/2025 | Treatment End Date: | 4/23/2025 |
| Treatment Summary: | Pumped 2000 gallons (47.6 bbls) 15% HCL w/solvent and 39 bbls fresh water. |
| Total fluid used in treatment (bbls): | 86 | Max pressure during treatment (psi): | 2187 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | 39 | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 2/17/2025 | Treatment End Date: | 2/17/2025 |
| Treatment Summary: | Pumped 2000 gallons (47.6 bbls) 15% HCL w/solvent and 35 bbls fresh water. |
| Total fluid used in treatment (bbls): | 82 | Max pressure during treatment (psi): | 2700 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 35 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 11/7/2023 | Treatment End Date: | 11/7/2023 |
| Treatment Summary: | PUMPED 2000 GALLONS (47.6 BBLS) WITH 15% HCL w/SOLVENT AND 40 BBLS OF WATER. |
| Total fluid used in treatment (bbls): | 87 | Max pressure during treatment (psi): | 2464 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 40 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 1/24/2023 | Treatment End Date: | 1/24/2023 |
| Treatment Summary: | Pumped 2000 gallons (47.6 bbls) and 15% HCL w/additives, inhibitor, mutual solvent and 35 bbls fresh water.
|
| Total fluid used in treatment (bbls): | 82 | Max pressure during treatment (psi): | 2450 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 35 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 8/13/2021 | Treatment End Date: | 8/13/2021 |
| Treatment Summary: | Pumped 2000 gallons (47.6 bbls) 15% HCL with Solvent.
Converted to injection 11/16/2000 |
| Total fluid used in treatment (bbls): | 47 | Max pressure during treatment (psi): | 1200 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Date: | 5/2/2012 |
| Treatment Summary: | ACID STIMULATION WITH 3000 GALLONS OF 20% HCL THROUGH END OF COILED TUBING AT 6499' AT 1.0 BPM @ 1000 PSI. |
| Formation Treatment |
| Treatment Date: | 4/13/2009 |
| Treatment Summary: | ACID STIMULATION 04-13-09 PUMPED 4000 GALLONS 20% HCL, BULLHEAD AT 2.4 BPM AND 797 PSI.
|