Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-05655
Well Classification: ERIW Status: IJ - 1/27/2023
Well Name/No:NEAL #4
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:SCOUT ENERGY MANAGEMENT LLC - 10779
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:47443
Facility Status:IJStatus Date1/27/2023
FacilityID:228688LocationID:314412
County:RIO BLANCO #103Location:SENW 25 2N103W 6
Field:RANGELY - #72370Elevation:5424 ft.
Planned Location:2034FNL  2065 FWLLat/Long: 40.115700 / -108.906836Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.115716 / -108.906854Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: ERIW             Status: IJ - 1/27/2023             Measured TD: 6490 ft.

 Wellbore Data for Original WellboreWellbore Classification: ERIW        IJ - 1/27/2023
Wellbore Permit
Permit #:10001 Expiration Date:2/24/2000
Prop Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEDERALSurface Owner:Not available
Unit: Unit Number:D-033720
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: 0 , Unit Acreage: 0, Drill Unit:

Wellbore Completed
Completion Date:1/27/1948
Spud Date:10/22/1947Spud Date Is:ACTUAL
Measured TD:6490 ft.Measured PB depth:6484 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CEMENT BOND LOG 1/11/2013
Log Types:NO NEW LOGS
Casing:String Type: SURF, Hole Size: 12 in., Size: 9.625 in., Top: 0 ft., Depth: 2868 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 900, Top: 0 ft., Bottom: 2868 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 5809 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 1000, Top: 0 ft., Bottom: 5808 ft., Determination Method: CALC
Casing:String Type: 2ND, Hole Size: 7 in., Size: 5.5 in., Top: 0 ft., Depth: 5499 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 284, Top: 0 ft., Bottom: 5499 ft., Determination Method: CALC
Casing:String Type: 1ST LINER, Hole Size: 7 in., Size: 5 in., Top: 5499 ft., Depth: 6488 ft., Weight: 18 , Citings Type: ACTUAL
Cement:Sacks: 125, Top: 0 ft., Bottom: 6488 ft., Determination Method: CALC
Casing:String Type: 2ND LINER, Hole Size: 7 in., Size: 5 in., Top: 5499 ft., Depth: 6488 ft., Weight: 18 , Citings Type: ACTUAL
Cement:Sacks: 125, Top: 5750 ft., Bottom: 6488 ft., Determination Method: CBL
Additional Cement:String Type: 1ST LINER , Top: 5904 ft., Depth: 6054 ft., Bottom: 6054 ft., Sacks: 50, Method: SQUEEZE
FormationInterval TopLog BottomCoredDSTs
WEBER5758 ft.6490 ft.NN

Formation WEBR                     Formation Classification:  ERIW                     Status:  IJ - 1/27/2023                 Interval Top: 6103 ft.    Interval Bottom: 6425 ft.

 Completed Information for Formation WEBER
1st Production Date:5/1/1984Choke Size: 
Formation Name:WEBERCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:1/25/2023Treatment End Date:1/25/2023
Treatment Summary:Pumped 2000 Gallons (47.6 bbl.) 15% HCL w/additives, inhibitor, mutual solvent and 35 bbl. fresh water.
Total fluid used in treatment (bbls):82Max pressure during treatment (psi):2450
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):47Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):35Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:
Treatment Date:9/30/2022Treatment End Date:N/A
Treatment Summary:WELL WAS SHUT IN WITH HIGH CASING PRESSURE, DETERMINED CASING LEAK FROM 6010-6020'. HALLIBURTON PUMPED 30 SKS 12.8 PPG 0.84 YIELD FINECHEM CEMENT FROM 6040-5762'. SQUEEZE ON CEMENT WITH 1145 PSI. RUN IN HOLE 167 JOINTS FIBERLINED TUBING AND NEW PACKER.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:10/2/2015Treatment End Date:10/2/2015
Treatment Summary:PUMPED 165 GALLONS SOLVENT AND 4000 GALLONS 15% HCL FIRST INJECTION 5/1/1984
Total fluid used in treatment (bbls):259Max pressure during treatment (psi):2378
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):160Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:
Treatment Date:3/5/2013Treatment End Date:N/A
Treatment Summary:RAN LINER FROM SURFACE TO 6488' (FORM 5 #400380685 SUBMITTED) RE-PERFED IN 4 RUNS.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:10/5/2010
Treatment Summary:ACIDIZE FORMATION WITH 4000 GALLONS 20% HCL, ENDOFCOILEDTBG @ 6295' STARTING PRESSURE 450 PSI. TOP PERFORATION @ 5762' - REPORTED AS 6762' IN ERROR ON FORM 21 DATED 06/04-2008.
Formation Treatment
Treatment Date:3/26/2008
Treatment Summary:ACIDIZE FORMATION WITH 3954 GALLONS HEATED 15% HCI, EOT @6168'
Tubing Size:2.875 in.Tubing Setting Depth:5977 ft.
Tubing Packer Depth:5895 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WEBR.
Perforation Data:
Interval Top:6103 ft.# Of Holes:336
Interval Bottom:6425 ft.Hole Size:0.5 in.

Sidetrack #01             Wellbore Classification:              Status: AB - 1/1/1999             Measured TD:

 Wellbore Data for Sidetrack #01Wellbore Classification:         AB - 1/1/1999
Wellbore Permit
Permit #: Expiration Date:7/30/2014
Prop Depth/Form:6475 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit:RANGELY Unit Number:COC47675X
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: 0 ft., Depth: 43 ft., Weight: 65 , Citings Type: PLANNED
Cement:Sacks: 4, Top: 0 ft., Bottom: 43 ft.
Casing:String Type: SURF, Hole Size: 16 in., Size: 13.375 in., Top: 0 ft., Depth: 639 ft., Weight: 38 , Citings Type: PLANNED
Cement:Sacks: 300, Top: 0 ft., Bottom: 639 ft.
Casing:String Type: 1ST, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2868 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 1000, Top: 0 ft., Bottom: 2868 ft.
Casing:String Type: 2ND, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 5808 ft., Weight: 23 , Citings Type: PLANNED
Cement:Sacks: 1000, Top: 0 ft., Bottom: 5808 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.25 in., Size: 5.5 in., Top: 4000 ft., Depth: 5358 ft., Weight: 15.5 , Citings Type: PLANNED
Cement:Sacks: 153, Top: 5400 ft., Bottom: 5358 ft.
Casing:String Type: 2ND LINER, Hole Size: 7 in., Size: 5.5 in., Top: 5620 ft., Depth: 6490 ft., Weight: 16.5 , Citings Type: PLANNED
Cement:Sacks: 300, Top: 5620 ft., Bottom: 6490 ft.
Casing:String Type: 1ST TAPER, Hole Size: 5.5 in., Size: 5 in., Top: 5358 ft., Depth: 6475 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 68, Top: 5358 ft., Bottom: 6475 ft.

Wellbore Completed
Completion Date:N/A
Measured TD:Measured PB depth:
True Vertical TD:True Vertical PB depth:
  No formation data to display.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
August 2023 - July 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)186637
GOR
GOR DeterminationMCFE
Average BOE per Day87.271
Average MCFE per Day506.187

 Federal Financial Assurance  i Y

 Tribal Well  i No