Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-05628
Well Classification: ERIW Status: SI - 12/3/2025
Well Name/No:EMERALD #28
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:SCOUT ENERGY MANAGEMENT LLC - 10779
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:47443
Facility Status:SIStatus Date12/3/2025
FacilityID:228665LocationID:314402
County:RIO BLANCO #103Location:NESW 25 2N103W 6
Field:RANGELY - #72370Elevation:5414 ft.
Basin:PICEANCE BASIN  
Planned Location:1980FSL  1980 FWLLat/Long: 40.112075 / -108.907167Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.112230 / -108.907160Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: DSPW             Status: SI - 12/3/2025             Measured TD: 6475 ft.    Vertical TD: 6475 ft.

 Wellbore Data for Original WellboreWellbore Classification: DSPW        SI - 12/3/2025
Wellbore Permit
Permit #:10001 Expiration Date:2/24/2000
Proposed Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: 0 , Unit Acreage: 0, Drill Unit:

Wellbore Completed
Completion Date:8/29/1984
Measured TD:6475 ft.Measured PB depth:6450 ft.
True Vertical TD:6475 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 0 FL  0 FL
Casing:String Type: CONDUCTOR, Hole Size: , Size: 16 in., Top: 0 ft., Depth: 32 ft., Weight: 55 , Citings Type: ACTUAL
Cement:Sacks: 106, Top: 0 ft., Bottom: 32 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: , Size: 10.75 in., Top: 0 ft., Depth: 1495 ft., Weight: 40.5 , Citings Type: ACTUAL
Cement:Sacks: 750, Top: 0 ft., Bottom: 1495 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: , Size: 7 in., Top: 0 ft., Depth: 5805 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 1100, Top: 0 ft., Bottom: 5805 ft., Determination Method:
Casing:String Type: 1ST LINER, Hole Size: , Size: 5.5 in., Top: 5630 ft., Depth: 6493 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 550, Top: 5630 ft., Bottom: 6493 ft., Determination Method: CBL

Formation WEBR                     Formation Classification:  ERIW                     Status:  SI - 12/3/2025                 Interval Top: 5832 ft.    Interval Bottom: 6406 ft.

 Completed Information for Formation WEBER
1st Production Date:8/29/1984Choke Size: 
Formation Name:WEBERCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:1/7/2026Treatment End Date:N/A
Treatment Summary:Repair suspected communication between the tubing and casing. Work included releasing both packers and production tubing, cleaned out, set bottom packer, set plug in profile tested tubing and casing, good tests. Changed out tubing head and landed well, tested tubing and pretested casing good tests. Operations summary and updated wellbore diagram attached. Return to injection pending an approved Form 21. MIT scheduled for December 11, 2025.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:1/21/2025Treatment End Date:1/21/2025
Treatment Summary:Pumped 2000 gallons (47.6 bbls) 15% HCL w/solvent and 150 bbls Fresh water.
Total fluid used in treatment (bbls):197Max pressure during treatment (psi):956
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):47Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):100Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):150Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:3/22/2024Treatment End Date:3/22/2024
Treatment Summary:PUMPED 4000 GALLONS (95.2 BBLS) 15% HCL W/SOLVENT AND 44 BBLS FRESH WATER.
Total fluid used in treatment (bbls):139Max pressure during treatment (psi):2180
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):44Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:1/4/2020Treatment End Date:1/4/2020
Treatment Summary:PUMPED 3822 GALLONS (91 BBLS) 15% HCL ACID AND 120 BBLS FRESH WATER
Total fluid used in treatment (bbls):211Max pressure during treatment (psi):1850
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):91Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):120Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:7/1/2015Treatment End Date:7/1/2015
Treatment Summary:pumped 4000 gallons w/ 248 gallons solventat 1.9 bpm @ 2460 psi.
Total fluid used in treatment (bbls):202Max pressure during treatment (psi):2460
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):101Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:8/20/2009
Treatment Summary:ACID STIMULATION 8/19/09 PUMPED 2000 GALS 20% HCI & 10,500 GALS CLO2 IN FOUR STAGES THROUGH TUBING AT 5611'. AVERAGE 3.5 BPM @ 1762 PSI
Tubing Size:2.875 in.Tubing Setting Depth:5616 ft.
Tubing Packer Depth:5552 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WEBR.
Perforation Data:
Interval Top:5832 ft.# Of Holes:108
Interval Bottom:6406 ft.Hole Size:0.5 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No