| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 11/7/2023 | Treatment End Date: | 11/7/2023 |
| Treatment Summary: | PUMPED 2000 GALLONS (47.6 BBLS) WITH 15% HCL w/SOLVENT AND 35 BBLS OF WATER.
CONVERTED WELL 02/21/1974 |
| Total fluid used in treatment (bbls): | 82 | Max pressure during treatment (psi): | 2500 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 35 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 5/18/2022 | Treatment End Date: | 5/18/2022 |
| Treatment Summary: | PUMPED 2000 GALLONS (47.6 BBLS) WITH 15% HCL AND 6% CITRIC ACID AND 35 BBLS OF WATER.
CONVERTED TO INJECTION 2/21/1974
|
| Total fluid used in treatment (bbls): | 82 | Max pressure during treatment (psi): | 2900 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 35 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 7/8/2021 | Treatment End Date: | 7/8/2021 |
| Treatment Summary: | PUMPED 2000 GALLONS (47.6 BBLS) WITH 15% HCL AND 6% CITRIC ACID AND 40 BBLS OF WATER.
CONVERTED TO INJECTION 2/21/1974 |
| Total fluid used in treatment (bbls): | 87 | Max pressure during treatment (psi): | 2113 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 40 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | |
| Treatment Date: | 2/22/2019 | Treatment End Date: | N/A |
| Treatment Summary: | WELLWORK TO RUN 5 1/2" CASING FROM SURFACE TO 5997' ANS CEMENT IN PLACE. A COGCC WITNESSED MIT IS SCHEDULED FOR 12/4/2018. THIS WELL WILL BE RETURNED TO ACTIVE INJECTION UPON APPROVAL OF ONLINE FORM 21.
THIS WELL WAS CONVERTED TO INJECTION 2/21/1974. |
| Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 12/5/2018 | Treatment End Date: | 12/5/2018 |
| Treatment Summary: | PUMPED 2000 GALLONS 15% HCL WITH 90 GALLONS SOLVENT, FLUSH WITH 182 BBLS WATER. FIRST INJECTION 2/21/1974. |
| Total fluid used in treatment (bbls): | 229 | Max pressure during treatment (psi): | 1400 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 182 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Date: | 4/8/2009 |
| Treatment Summary: | ACIDIZE FORMATION WITH 4000 GALLONS HEATED 20% HCL, AT END OF COILED TUBING @ 6499. |