Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 11/11/2022 | Treatment End Date: | 11/11/2022 |
Treatment Summary: | Pumped 2000 gallons (47.6 bbl.) 15% HCL with solvent and 20 bbl. water |
Total fluid used in treatment (bbls): | 67 | Max pressure during treatment (psi): | 2400 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 20 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 2/12/2015 | Treatment End Date: | 2/12/2015 |
Treatment Summary: | ACID STIMULATION PUMPED 4000 GALLONS OF 15% |
Total fluid used in treatment (bbls): | 195 | Max pressure during treatment (psi): | 1500 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 100 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Date: | 3/20/2008 |
Treatment Summary: | ACIDIZED FORMATION W/ 4500 GALS HEATED 15% HCI, EOT @ 6530'. |