Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-05483
Well Classification: OBW Status: AC - 11/4/2022
Well Name/No:MCLAUGHLIN, S W #1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:SCOUT ENERGY MANAGEMENT LLC - 10779
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:47443
Facility Status:ACStatus Date11/4/2022
FacilityID:228586LocationID:314369
County:RIO BLANCO #103Location:NWSE 33 2N102W 6
Field:RANGELY - #72370Elevation:5230 ft.
Planned Location:1980FSL  1980 FELLat/Long: 40.097624 / -108.845699Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.097710 / -108.845890Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: ERIW             Status: AB - 3/20/1986             Measured TD: 5150 ft.    Vertical TD: 5150 ft.

 Wellbore Data for Original WellboreWellbore Classification: ERIW        AB - 3/20/1986
Wellbore Permit
Permit #:970134 Expiration Date:2/19/1998
Prop Depth/Form:
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: 0 , Unit Acreage: 0, Drill Unit:

Wellbore Completed
Completion Date:4/19/1973
Measured TD:5150 ft.Measured PB depth:5115 ft.
True Vertical TD:5150 ft.True Vertical PB depth:
Casing:String Type: SURF, Hole Size: , Size: 8.625 in., Top: 0 ft., Depth: 4007 ft., Weight: , Citings Type: HISTORICAL
Cement:Sacks: 0, Top: 0 ft., Bottom: , Determination Method:
Casing:String Type: 1ST LINER, Hole Size: 0 in., Size: 5.5 in., Top: 0 ft., Depth: 0 ft., Weight: , Citings Type: HISTORICAL
Cement:Sacks: 0, Top: 0 ft., Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
WEBER5522 ft.

Formation WEBR                     Formation Classification:  ERIW                     Status:  AB - 11/4/2022                 Interval Top: 5592 ft.    Interval Bottom: 6427 ft.

 Completed Information for Formation WEBER
1st Production Date:12/28/2004Choke Size: 
Formation Name:WEBERCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:9/24/2020Treatment End Date:9/24/2020
Treatment Summary:PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL W/6% CITRIC ACID AND 80 BBLS WATER
Total fluid used in treatment (bbls):127Max pressure during treatment (psi):2100
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):47Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):80Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.875 in.Tubing Setting Depth:5605 ft.
Tubing Packer Depth:5514 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WEBR.
Perforation Data:
Interval Top:5592 ft.# Of Holes:509
Interval Bottom:6427 ft.Hole Size:0.5 in.

Sidetrack #01             Wellbore Classification: ERIW             Status: AC - 11/4/2022             Measured TD: 6479 ft.    Vertical TD: 6024 ft.

 Wellbore Data for Sidetrack #01Wellbore Classification: ERIW        AC - 11/4/2022
Wellbore PermitDIRECTIONAL
Permit #:Expiration Date:N/A
Prop Depth/Form:
Surface Mineral Owner Same:
Mineral Owner:Surface Owner:
Unit: Unit Number: 

Wellbore Completed
Completion Date:7/23/1997
Spud Date:6/21/1997Spud Date Is:ACTUAL
Measured TD:6479 ft.Measured PB depth:
True Vertical TD:6024 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 2005 FSL  1591 FELDepth
Bottom Hole Location:Sec:33 Twp: 2N 102WFootage: 2007 FSL  1244 FELDepth
Log Types:COMP NEU GR, SEGMENTED BOND TOO, GR, CASING COLLAR
Casing:String Type: CONDUCTOR, Hole Size: , Size: 16 in., Top: 0 ft., Depth: 57 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 57 ft., Determination Method:
Casing:String Type: SURF, Hole Size: , Size: 10.75 in., Top: 0 ft., Depth: 1029 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 425, Top: 0 ft., Bottom: 1029 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: , Size: 7 in., Top: 0 ft., Depth: 5592 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1250, Top: 0 ft., Bottom: 5592 ft., Determination Method:
Casing:String Type: 1ST LINER, Hole Size: , Size: 4.5 in., Top: 5085 ft., Depth: 6479 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 195, Top: 5085 ft., Bottom: 6479 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WEBER5522 ft.NN

Formation WEBR                     Formation Classification:  ERIW                     Status:  AC - 11/4/2022                 Interval Top: 5592 ft.    Interval Bottom: 6427 ft.

 Completed Information for Formation WEBER
1st Production Date:12/28/2004Choke Size: 
Formation Name:WEBERCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:2/6/2017Treatment End Date:N/A
Treatment Summary:CORRECTION TO PERF INTERVAL, TUBING AND PACKER DEPTHS REORTED ON DOCUMENT #400789104
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:
Treatment Date:1/23/2017Treatment End Date:N/A
Treatment Summary:CORRECTION TO TUBING AND PACKER DEPTHS REPORTED ON DOCUMENT #400789104.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:1/6/2015Treatment End Date:1/6/2015
Treatment Summary:ADDED NEW PERFS IN 3 STAGES 6261-6399, 5908-6236, 5592-5892' 3SPF. 85 NEW HOLES PUMPED 85 BBLS 15% HCL AT 4.5 BPM @ 2200 PSI.
Total fluid used in treatment (bbls):115Max pressure during treatment (psi):2200
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):85Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):30Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:7/10/2012Treatment End Date:8/12/2012
Treatment Summary:ORIGINAL PERFORATIONS 6050-6427' ADDITIONAL PERFS ADDED 5865-5880' 4SPF - 60 PERFS, 5810-5836 4 SPF 104 PERFS, 5618-5644 4 SPF 144 PERFS, 5790 -5806' 4 SPF 60 HOLES. PUMP 15% ACID - NEW PERFS
Total fluid used in treatment (bbls):105Max pressure during treatment (psi):2240
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):33Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):72Disposition method For flowback:RECYCLE
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.875 in.Tubing Setting Depth:5605 ft.
Tubing Packer Depth:5514 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WEBR.
Perforation Data:
Interval Top:5592 ft.# Of Holes:509
Interval Bottom:6427 ft.Hole Size:0.5 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
June 2023 - May 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No