Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-01068
Well Classification: ERIW Status: IJ - 2/1/2018
Well Name/No:SHARPLES-MCLAUGHLIN #2-33
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:SCOUT ENERGY MANAGEMENT LLC - 10779
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:47443
Facility Status:IJStatus Date2/1/2018
FacilityID:228150LocationID:314269
County:RIO BLANCO #103Location:NWNE 33 2N102W 6
Field:RANGELY - #72370Elevation:5255 ft.
Planned Location:660FNL  1980 FELLat/Long: 40.104916 / -108.845765Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.104940 / -108.845980Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: ERIW             Status: IJ - 2/1/2018             Measured TD: 6338 ft.    Vertical TD: 0 ft.

 Wellbore Data for Original WellboreWellbore Classification: ERIW        IJ - 2/1/2018
Wellbore Permit
Permit #:10001 Expiration Date:3/7/1978
Prop Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: 0 , Unit Acreage: 0, Drill Unit:

Wellbore Completed
Completion Date:4/13/1982
Spud Date:6/10/1945Spud Date Is:ACTUAL
Measured TD:6338 ft.Measured PB depth:6338 ft.
True Vertical TD:0 ft.True Vertical PB depth:
Casing:String Type: CONDUCTOR, Hole Size: , Size: 16 in., Top: 0 ft., Depth: 72 ft., Weight: 70 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 72 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: , Size: 10.75 in., Top: 0 ft., Depth: 2186 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 1050, Top: 0 ft., Bottom: 2186 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: , Size: 7 in., Top: 0 ft., Depth: 5636 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 850, Top: 0 ft., Bottom: 5636 ft., Determination Method:
Casing:String Type: 1ST LINER, Hole Size: , Size: 5 in., Top: 5456 ft., Depth: 6338 ft., Weight: 18 , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 5456 ft., Bottom: 6338 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
DAKOTA3055 ft.
MORRISON3798 ft.
CHINLE4683 ft.
WEBER5550 ft.

Formation WEBR                     Formation Classification:  ERIW                     Status:  IJ - 2/1/2018                  Interval Top: 5652 ft.    Interval Bottom: 6278 ft.

 Completed Information for Formation WEBER
1st Production Date:9/1/1945Choke Size: 
Formation Name:WEBERCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:1/25/2018Treatment End Date:N/A
Treatment Summary:WELL WORK TO REPLACE TUBING AND TOP PACKER. PACKER SETTING DEPTH DISCUSSED WITH COGCC PE CRAIG BURGER AND VERBAL APPROVAL RECIEVED. COGCC WITNESSED MIT 1/18/2018
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:
Treatment Date:11/22/2016Treatment End Date:N/A
Treatment Summary:First injection 4/1/1967. Correcting tubing and packer depths. Last workover 3/27/1995 see the tubing landing detail attached.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:6/5/2009
Treatment Summary:ACIDIZE FORMATION W/ 4,000 GALS HEATED 20% HCI. END OF COILED TUBING @ 5383' & 5940'.
Tubing Size:2.875 in.Tubing Setting Depth:6289 ft.
Tubing Packer Depth:5338 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WEBR.
Perforation Data:
Interval Top:5652 ft.# Of Holes:207
Interval Bottom:6278 ft.Hole Size:0.5 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
June 2023 - May 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)664978
GOR
GOR DeterminationMCFE
Average BOE per Day313.541
Average MCFE per Day1818.528

 Federal Financial Assurance  i 

 Tribal Well  i No