Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-01053
Well Classification: ERIW Status: IJ - 6/3/2022
Well Name/No:MCLAUGHLIN, A C #18
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:SCOUT ENERGY MANAGEMENT LLC - 10779
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:47443
Facility Status:IJStatus Date6/3/2022
FacilityID:228135LocationID:314259
County:RIO BLANCO #103Location:SWNW 14 2N103W 6
Field:RANGELY - #72370Elevation:5497 ft.
Planned Location:1980FNL  660 FWLLat/Long: 40.144775 / -108.930628Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.144957 / -108.930151Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: ERIW             Status: IJ - 6/3/2022             Measured TD: 6660 ft.

 Wellbore Data for Original WellboreWellbore Classification: ERIW        IJ - 6/3/2022
Wellbore Permit
Permit #:100001 Expiration Date:2/24/2000
Prop Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEDERALSurface Owner:Not available
Unit: Unit Number:D-032675
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: 0 , Unit Acreage: 0, Drill Unit:

Wellbore Completed
Completion Date:2/22/1947
Spud Date:1/8/1947Spud Date Is:ACTUAL
Measured TD:6660 ft.Measured PB depth:6660 ft.
True Vertical TD:True Vertical PB depth:
Log Types:NO NEW LOGS
Casing:String Type: CONDUCTOR, Hole Size: , Size: 16 in., Top: 0 ft., Depth: 59 ft., Weight: 55 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 100 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: , Size: 10.75 in., Top: 0 ft., Depth: 722 ft., Weight: 40.5 , Citings Type: ACTUAL
Cement:Sacks: 500, Top: 0 ft., Bottom: 722 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6395 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 1250, Top: 1517 ft., Bottom: 6395 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 7 in., Size: 5.5 in., Top: 6246 ft., Depth: 6603 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 6246 ft., Bottom: 6603 ft., Determination Method: CALC
Casing:String Type: OPEN HOLE, Hole Size: 4.625 in., Size: , Top: 6603 ft., Depth: 6660 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
DAKOTA3760 ft.NN
NAVAJO4875 ft.NN
WEBER6381 ft.NN

Formation WEBR                     Formation Classification:  ERIW                     Status:  IJ - 6/3/2022                  Interval Top: 6416 ft.    Interval Bottom: 6660 ft.

 Completed Information for Formation WEBER
1st Production Date:7/1/2008Choke Size: 
Formation Name:WEBERCommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:5/25/2022Treatment End Date:5/25/2022
Treatment Summary:PUMPED 4000 GALLONS (95.2 BBLS) 15% HCL W/MUTUAL SOLVENT AND 35 BBLS WATER CONVERT TO INJECTION 4/1/1967, CONVERTED BACK TO PRODUCTION 5/1/1997, CONVERTED BACK TO INJECTION 7/1/2008
Total fluid used in treatment (bbls):130Max pressure during treatment (psi):2050
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):35Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:7/21/2021Treatment End Date:7/21/2021
Treatment Summary:PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL W/6% CITRIC ACID AND 40 BBLS WATER
Total fluid used in treatment (bbls):87Max pressure during treatment (psi):2020
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):47Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):40Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:9/25/2020Treatment End Date:9/25/2020
Treatment Summary:PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL W/6% CITRIC ACID AND 1.9 BBLS SOLVENT, AND 43.0 BBLS FRESH WATER PERFS 6416-6591 AND OPEN HOLE 6605-6660'. CONVERT TO INJECTION 4/1/1967, CONVERTED BACK TO PRODUCTION 5/1/1997, CONVERTED BACK TO INJECTION 7/1/2008.
Total fluid used in treatment (bbls):92Max pressure during treatment (psi):2500
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):47Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):43Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:
Treatment Date:6/20/2017Treatment End Date:N/A
Treatment Summary:AC MCLAUGHLIN 18 WELLWORK HAS BEEN COMPLETED TO REPLACE TUBING AND PACKERS. TOP PACKER SET AT 6104.2 PERFS 6416-6591 AND OPEN HOLE 6605-6660'. CONVERT TO INJECTION 4/1/1967, CONVERTED BACK TO PRODUCTION 5/1/1997, CONVERTED BACK TO INJECTION 7/1/2008.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:2/12/2008
Treatment Summary:OPEN HOLE 6605-6660'. CTI-RIH W/3 1/8" SLICK GUNS LOADED W 3 JSPF 120 DEGREE PHASED 23 GRAM CHARGES IN 5 RUNS PERFORATE 6565-6416 WITH TOTAL OF 381 HOLES. RIH WITH INJECTION STRING.
Tubing Size:2.875 in.Tubing Setting Depth:6286 ft.
Tubing Packer Depth:6104 ft.Tubing Multiple Packer:
Open Hole Top:6603 ft.Open Hole Bottom:6660 ft.
No Initial Test Data was found for formation WEBR.
Perforation Data:
Interval Top:6416 ft.# Of Holes:3811
Interval Bottom:6660 ft.Hole Size:0.5 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
August 2023 - July 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)141146
GOR
GOR DeterminationMCFE
Average BOE per Day67.698
Average MCFE per Day392.638

 Federal Financial Assurance  i Y

 Tribal Well  i No