Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-01052
Well Classification: ERIW Status: IJ - 5/1/2023
Well Name/No:MCLAUGHLIN, A C #31
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:SCOUT ENERGY MANAGEMENT LLC - 10779
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:47443
Facility Status:IJStatus Date5/1/2023
FacilityID:228134LocationID:314258
County:RIO BLANCO #103Location:SENE 15 2N103W 6
Field:RANGELY - #72370Elevation:5519 ft.
Planned Location:1850FNL  660 FELLat/Long: 40.145125 / -108.935348Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.145238 / -108.935368Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: IJ - 5/1/2023             Measured TD: 6705 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        IJ - 5/1/2023
Wellbore Permit
Permit #:10001 Expiration Date:1/6/1956
Prop Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEDERALSurface Owner:Not available
Unit: Unit Number:D-032675
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: 0 , Unit Acreage: 0, Drill Unit:

Wellbore Completed
Completion Date:5/26/1947
Spud Date:3/12/1947Spud Date Is:ACTUAL
Measured TD:6705 ft.Measured PB depth:6705 ft.
True Vertical TD:True Vertical PB depth:
Log Types:NO NEW LOGS
Log Types:CBL, CAL, GR, CCL
Casing:String Type: CONDUCTOR, Hole Size: 21 in., Size: 16 in., Top: 0 ft., Depth: 59 ft., Weight: 55 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 59 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 10.75 in., Top: 0 ft., Depth: 747 ft., Weight: 40.5 , Citings Type: ACTUAL
Cement:Sacks: 500, Top: 0 ft., Bottom: 747 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6410 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 1250, Top: 4378 ft., Bottom: 6410 ft., Determination Method: CBL
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 5.5 in., Top: 0 ft., Depth: 6295 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 285, Top: 0 ft., Bottom: 6295 ft., Determination Method: VISU
Casing:String Type: OPEN HOLE, Hole Size: 6.125 in., Size: , Top: 6410 ft., Depth: 6705 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
Additional Cement:String Type: 1ST , Top: 2183 ft., Depth: 2331 ft., Bottom: 2362 ft., Sacks: 50, Method: SQUEEZE
Additional Cement:String Type: 2ND , Top: 0 ft., Depth: 6243 ft., Bottom: 6295 ft., Sacks: 286, Method: STAGE TOOL
FormationInterval TopLog BottomCoredDSTs
NIOBRARA2679 ft.NN
FRONTIER3440 ft.NN
MOWRY3712 ft.NN
DAKOTA3796 ft.NN
MORRISON3883 ft.NN
CURTIS4596 ft.NN
ENTRADA4697 ft.NN
CARMEL4840 ft.NN
NAVAJO4896 ft.NN
CHINLE5522 ft.NN
SHINARUMP5640 ft.NN
MOENKOPI5715 ft.NN
WEBER6404 ft.NN

Formation WEBR                     Formation Classification:  ERIW                     Status:  IJ - 5/1/2023                  Interval Top: 6410 ft.    Interval Bottom: 6705 ft.

 Completed Information for Formation WEBER
1st Production Date:6/1/1972Choke Size: 
Formation Name:WEBERCommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:4/26/2023Treatment End Date:4/26/2023
Treatment Summary:PUMPED 640 gallons (15.2 BBLS) of 15% HCL, 260 gallons (6.1 BBLS) CND-600, 104 gallons (2.4 BBLS) Acroline and 290 BBLS Fresh water.
Total fluid used in treatment (bbls):313Max pressure during treatment (psi):2500
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):23Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):290Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:11/21/2019Treatment End Date:11/21/2019
Treatment Summary:PUMPED 4000 GALLONS (95.2 BBLS) 15% HCL, 6% CITRIC MUTSOL, 90 BBLS FRESH WATER
Total fluid used in treatment (bbls):185Max pressure during treatment (psi):1200
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):90Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:8/14/2014Treatment End Date:8/14/2014
Treatment Summary:PUMP 15% HCL
Total fluid used in treatment (bbls):165Max pressure during treatment (psi):1800
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):70Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:4/27/2009
Treatment Summary:ACID STIMULATION 04/28/09 BULLHEAD 4500 GALLONS OF HEATED 20% HCL THROUGH TUBING @ 3.4 BPM AT 1588 PSI.
Tubing Size:2.875 in.Tubing Setting Depth:6361 ft.
Tubing Packer Depth:6222 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WEBR.
Perforation Data:
Interval Top:6410 ft.# Of Holes:
Interval Bottom:6705 ft.Hole Size:0.5 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
June 2023 - May 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)428240
GOR
GOR DeterminationMCFE
Average BOE per Day202.004
Average MCFE per Day1171.597

 Federal Financial Assurance  i Y

 Tribal Well  i No