|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: IJ - 11/14/2024 Measured TD: 6705 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW IJ - 11/14/2024 | | Wellbore Permit | | | Permit #: | 10001 | Expiration Date: | 1/6/1956 | | Proposed Depth/Form: | | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEDERAL | Surface Owner: | Not available | | Unit: | | Unit Number: | D-032675 | | Formation And Spacing: | Code: WEBR , Formation: WEBER , Order: 0 , Unit Acreage: 0, Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 5/26/1947 | | Spud Date: | 3/12/1947 | Spud Date Is: | ACTUAL | | Measured TD: | 6705 ft. | Measured PB depth: | 6705 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | NO NEW LOGS | | Log Types: | CBL, CAL, GR, CCL | | Casing: | String Type: CONDUCTOR, Hole Size: 21 in., Size: 16 in., Top: 0 ft., Depth: 59 ft., Weight: 55 , Citings Type: ACTUAL | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 59 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 10.75 in., Top: 0 ft., Depth: 747 ft., Weight: 40.5 , Citings Type: ACTUAL | | Cement: | Sacks: 500, Top: 0 ft., Bottom: 747 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6410 ft., Weight: 23 , Citings Type: ACTUAL | | Cement: | Sacks: 1250, Top: 4378 ft., Bottom: 6410 ft., Determination Method: CBL | | Casing: | String Type: 2ND, Hole Size: 6.125 in., Size: 5.5 in., Top: 0 ft., Depth: 6295 ft., Weight: 17 , Citings Type: ACTUAL | | Cement: | Sacks: 285, Top: 0 ft., Bottom: 6295 ft., Determination Method: VISU | | Casing: | String Type: OPEN HOLE, Hole Size: 6.125 in., Size: , Top: 6410 ft., Depth: 6705 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: , Top: , Bottom: , Determination Method: | | Additional Cement: | String Type: 1ST , Top: 2183 ft., Depth: 2331 ft., Bottom: 2362 ft., Sacks: 50, Method: SQUEEZE | | Additional Cement: | String Type: 2ND , Top: 0 ft., Depth: 6243 ft., Bottom: 6295 ft., Sacks: 286, Method: STAGE TOOL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 2679 ft. | | N | N | | FRONTIER | 3440 ft. | | N | N | | MOWRY | 3712 ft. | | N | N | | DAKOTA | 3796 ft. | | N | N | | MORRISON | 3883 ft. | | N | N | | CURTIS | 4596 ft. | | N | N | | ENTRADA | 4697 ft. | | N | N | | CARMEL | 4840 ft. | | N | N | | NAVAJO | 4896 ft. | | N | N | | CHINLE | 5522 ft. | | N | N | | SHINARUMP | 5640 ft. | | N | N | | MOENKOPI | 5715 ft. | | N | N | | WEBER | 6404 ft. | | N | N |
Formation WEBR Formation Classification: ERIW Status: IJ - 11/14/2024 Interval Top: 6410 ft. Interval Bottom: 6705 ft.| Completed Information for Formation WEBER | | 1st Production Date: | 6/1/1972 | Choke Size: | | | Formation Name: | WEBER | Commingled: | No | | Production Method: | | | Open Hole Completion: | Yes |
| | Formation Treatment | | Treatment Type: | ACID JOB | | Treatment Date: | 11/12/2024 | Treatment End Date: | 11/12/2024 | | Treatment Summary: | PUMPED 4000 GALLONS (95.2 BBLS) 15% HCL W/SOLVENT AND 39 BBLS FRESH WATER | | Total fluid used in treatment (bbls): | 134 | Max pressure during treatment (psi): | 1726 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | 39 | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Type: | ACID JOB | | Treatment Date: | 4/26/2023 | Treatment End Date: | 4/26/2023 | | Treatment Summary: | PUMPED 640 gallons (15.2 BBLS) of 15% HCL, 260 gallons (6.1 BBLS) CND-600, 104 gallons (2.4 BBLS) Acroline and 290 BBLS Fresh water.
| | Total fluid used in treatment (bbls): | 313 | Max pressure during treatment (psi): | 2500 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | 23 | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | 290 | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Type: | ACID JOB | | Treatment Date: | 11/21/2019 | Treatment End Date: | 11/21/2019 | | Treatment Summary: | PUMPED 4000 GALLONS (95.2 BBLS) 15% HCL, 6% CITRIC MUTSOL, 90 BBLS FRESH WATER | | Total fluid used in treatment (bbls): | 185 | Max pressure during treatment (psi): | 1200 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | 90 | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Type: | ACID JOB | | Treatment Date: | 8/14/2014 | Treatment End Date: | 8/14/2014 | | Treatment Summary: | PUMP 15% HCL | | Total fluid used in treatment (bbls): | 165 | Max pressure during treatment (psi): | 1800 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | 70 | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Date: | 4/27/2009 | | Treatment Summary: | ACID STIMULATION 04/28/09 BULLHEAD 4500 GALLONS OF HEATED 20% HCL THROUGH TUBING @ 3.4 BPM AT 1588 PSI. |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 6361 ft. | | Tubing Packer Depth: | 6222 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation WEBR. |
| | Perforation Data: | | Interval Top: | 6410 ft. | # Of Holes: | | | Interval Bottom: | 6705 ft. | Hole Size: | 0.5 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | Y |
|
|