Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-01050
Well Classification: ERIW Status: IJ - 8/1/2024
Well Name/No:MCLAUGHLIN, A C #26
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:SCOUT ENERGY MANAGEMENT LLC - 10779
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:47443
Facility Status:IJStatus Date8/1/2024
FacilityID:228132LocationID:314256
County:RIO BLANCO #103Location:SESE 15 2N103W 6
Field:RANGELY - #72370Elevation:5515 ft.
Planned Location:731FSL  731 FELLat/Long: 40.137785 / -108.935558Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.137890 / -108.935630Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: DSPW             Status: IJ - 8/1/2024             Measured TD: 6672 ft.    Vertical TD: 0 ft.

 Wellbore Data for Original WellboreWellbore Classification: DSPW        IJ - 8/1/2024
Wellbore Permit
Permit #:10001 Expiration Date:3/9/1980
Prop Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEDERALSurface Owner:Not available
Unit: Unit Number:D-032675
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: 0 , Unit Acreage: 0, Drill Unit:

Wellbore Completed
Completion Date:2/20/1985
Measured TD:6672 ft.Measured PB depth:6660 ft.
True Vertical TD:0 ft.True Vertical PB depth:
Casing:String Type: SURF, Hole Size: , Size: 10.75 in., Top: 0 ft., Depth: 697 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 697 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: , Size: 7 in., Top: 0 ft., Depth: 6301 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 6301 ft., Determination Method: CALC
Casing:String Type: 1ST LINER, Hole Size: , Size: 5 in., Top: 6112 ft., Depth: 6672 ft., Weight: 18 , Citings Type: ACTUAL
Cement:Sacks: 225, Top: 6112 ft., Bottom: 6672 ft., Determination Method: CALC

Formation WEBR                     Formation Classification:  ERIW                     Status:  IJ - 8/1/2024                  Interval Top: 6320 ft.    Interval Bottom: 6649 ft.

 Completed Information for Formation WEBER
1st Production Date:2/19/1985Choke Size: 
Formation Name:WEBERCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:8/1/2022Treatment End Date:8/1/2022
Treatment Summary:PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL w/6% CITRIC ACID AND 35 BBLS WATER
Total fluid used in treatment (bbls):82Max pressure during treatment (psi):2400
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):47Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):35Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:11/12/2021Treatment End Date:11/12/2021
Treatment Summary:PUMPED 4000 GALLONS (95.2 BBLS) 15% HCL w/6% CITRIC ACID AND 45 BBLS WATER
Total fluid used in treatment (bbls):140Max pressure during treatment (psi):2400
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):45Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:3/4/2021Treatment End Date:3/4/2021
Treatment Summary:PUMPED 4000 GALLONS (95.2 BBLS) 15% HCL w/6% CITRIC ACID AND 44 BBLS WATER
Total fluid used in treatment (bbls):139Max pressure during treatment (psi):2300
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):44Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:7/9/2019Treatment End Date:7/9/2019
Treatment Summary:PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL w/ 3%CITRIC ACID AND 95 BBLS WATER. FIRST INJECTION 2/20/1985.
Total fluid used in treatment (bbls):142Max pressure during treatment (psi):2273
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):47Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):95Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:8/2/2017Treatment End Date:8/2/2017
Treatment Summary:pumped 2000 gallons 15% HCl and 110 gallons solvent with 191 bbls water. first injection 2/20/1985
Total fluid used in treatment (bbls):241Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):47Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):191Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:6/3/2015Treatment End Date:6/3/2015
Treatment Summary:Pumped 1000 gallons 15% HCl
Total fluid used in treatment (bbls):104Max pressure during treatment (psi):2400
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):24Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):80Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:6/2/2010
Treatment Summary:ACID STIMULATION 6-2-2010 PUMPED 4000 GALLONS 20% HCI AT .9 BM @ 400 PSI THROUGH END OF TUBING 6569'.
Formation Treatment
Treatment Date:8/4/2009
Treatment Summary:ACIDIZE FORMATION W/ 4000 GALS 20% HCI, EOT @ 6569'.
Tubing Size:2.875 in.Tubing Setting Depth:6569 ft.
Tubing Packer Depth:5988 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WEBR.
Perforation Data:
Interval Top:6320 ft.# Of Holes:151
Interval Bottom:6649 ft.Hole Size:0.5 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
August 2023 - July 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)15766
GOR
GOR DeterminationMCFE
Average BOE per Day7.418
Average MCFE per Day43.027

 Federal Financial Assurance  i Y

 Tribal Well  i No