Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 11/9/2022 | Treatment End Date: | 11/9/2022 |
Treatment Summary: | PUMPED 4000 GALLONS (95.2 BBLS) 15% HCL WITH INHIBITOR AND MUTAL SOLVENT AND 35 BBLS WATER
|
Total fluid used in treatment (bbls): | 130 | Max pressure during treatment (psi): | 2500 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 35 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | |
Treatment Date: | 6/8/2022 | Treatment End Date: | N/A |
Treatment Summary: | Per MOU reporting tubing plug set at 5544' on 04/25/2022
Converted to injection 08/08/1984 |
Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Date: | 4/6/2007 |
Treatment Summary: | ACIDIZE FORMATION WITH 4000 GALLONS HEATED 15% HCI, EOT @ 5700' |