|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: ERIW Status: SI - 1/1/2024 Measured TD: 5702 ft. Vertical TD: 5702 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: ERIW SI - 1/1/2024 | | Wellbore Permit | | | Permit #: | 19990777 | Expiration Date: | 10/20/2000 | | Proposed Depth/Form: | 5800 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 26-27 , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 11/13/1999 | | Spud Date: | 11/3/1999 | Spud Date Is: | ACTUAL | | Measured TD: | 5702 ft. | Measured PB depth: | 5656 ft. | | True Vertical TD: | 5702 ft. | True Vertical PB depth: | 5656 ft. | | Log Types: | IND,NEU-DENS | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 180 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 125, Top: 0 ft., Bottom: 180 ft., Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 5702 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 328, Top: 3906 ft., Bottom: 5702 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PIERRE | 205 ft. | | N | N | | CARLILE | 512 ft. | | N | N | | NIOBRARA | 4714 ft. | | N | N | | FORT HAYS | 5076 ft. | | N | N | | CODELL | 5110 ft. | | N | N | | GREENHORN | 5358 ft. | | N | N | | GRANEROS | 5396 ft. | | N | N | | BENTONITE | 5446 ft. | 5448 ft. | N | N | | D SAND | 5526 ft. | 5550 ft. | N | N | | J SAND | 5595 ft. | | N | N |
Formation JSND Formation Classification: ERIW Status: SI - 1/1/2024 Interval Top: 5598 ft. Interval Bottom: 5612 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 3/20/2001 | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | CASING SWAB | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/13/1999 | | Treatment Summary: | |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 5568 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/12/1999 | Test Method: | SWAB | | Hours Tested: | 4 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 80 | | BBLS_OIL | 0 | | CALC_BBLS_H2O | 80 | | CALC_BBLS_OIL | 0 | | CALC_MCF_GAS | 0 | | MCF_GAS | 0 |
| | Perforation Data: | | Interval Top: | 5598 ft. | # Of Holes: | 56 | | Interval Bottom: | 5612 ft. | Hole Size: | 0.5 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (UIC) | Y | Last Use 04/30/2023 |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|