|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 8/15/2018 Measured TD: 8288 ft. Vertical TD: 8085 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 8/15/2018 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 5/23/2019 | Proposed Top PZ Location: | Sec:24 Twp: 9S 94W | Footage: 2281 1454 | Bottom Hole Location: | Sec:24 Twp: 9S 94W | Footage: 2281 1454 | Proposed Depth/Form: | 8280 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: MVRD , Formation: MESAVERDE , Order: 429-16 , Unit Acreage: 640, Drill Unit: Sec 24 All | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 60 ft., Weight: 112 , Citings Type: PLANNED | Cement: | Sacks: 100, Top: 0 ft., Bottom: 60 ft. | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 1530 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 306, Top: 0 ft., Bottom: 1530 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8280 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 1347, Top: 1030 ft., Bottom: 8280 ft. |
| | |
Wellbore Completed | Completion Date: | 3/7/2018 | Spud Date: | 2/26/2018 | Spud Date Is: | ACTUAL | Measured TD: | 8288 ft. | Measured PB depth: | 8192 ft. | True Vertical TD: | 8085 ft. | True Vertical PB depth: | 7989 ft. | Top PZ Location: | Sec:24 Twp: 9S 94W | Footage: 2305 FNL 1538 FEL | Bottom Hole Location: | Sec:24 Twp: 9S 94W | Footage: 2281 N 1552 E | Log Types: | RPM, PULSED NEUTRON, CBL, MUD (Triple Combo in API 77-10397) | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 90 ft., Weight: 37 , Citings Type: ACTUAL | Cement: | Sacks: 100, Top: 0 ft., Bottom: 90 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 1571 ft., Weight: 28 , Citings Type: ACTUAL | Cement: | Sacks: 298, Top: 0 ft., Bottom: 1571 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8278 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 1299, Top: 2872 ft., Bottom: 8278 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | OHIO CREEK | 4413 ft. | | | | WILLIAMS FORK | 4770 ft. | | | | CAMEO | 6841 ft. | | | | ROLLINS | 7440 ft. | | | | COZZETTE | 7861 ft. | | | | CORCORAN | 8043 ft. | | | |
Formation CRCRN Formation Classification: GW Status: PR - 8/15/2018 Interval Top: 8050 ft. Interval Bottom: 8086 ft. Completed Information for Formation CORCORAN | 1st Production Date: | 7/17/2018 | Choke Size: | | Formation Name: | CORCORAN | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 7/17/2018 | Treatment End Date: | 7/17/2018 | Treatment Summary: | 5,000 BBLS SLICKWATER; NO PROPPANT | Total fluid used in treatment (bbls): | 5000 | Max pressure during treatment (psi): | 5712 | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.34 | Type Of gas: | | Number Of staged intervals: | 1 | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.79 | Recycled water used in treatment (bbls): | 3931 | Total flowback volume recovered (bbls): | 3057 | Fresh water used in treatment (bbls): | 1069 | Disposition method For flowback: | RECYCLE | Total proppant used (lbs): | 0 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7932 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 8/15/2018 | Test Method: | FLOWING | Hours Tested: | 1 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 1 | BTU_GAS | 1080 | CALC_BBLS_H2O | 24 | CALC_MCF_GAS | 106 | CASING_PRESS | 1435 | MCF_GAS | 4 | TUBING_PRESS | 870 |
| Perforation Data: | Interval Top: | 8050 ft. | # Of Holes: | 18 | Interval Bottom: | 8086 ft. | Hole Size: | 0.37 in. |
|
Formation COZZ Formation Classification: GW Status: PR - 8/15/2018 Interval Top: 7894 ft. Interval Bottom: 7972 ft. Completed Information for Formation COZZETTE | 1st Production Date: | 7/18/2018 | Choke Size: | | Formation Name: | COZZETTE | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 7/18/2018 | Treatment End Date: | 7/18/2018 | Treatment Summary: | 10,000 BBLS SLICKWATER; NO PROPPANT | Total fluid used in treatment (bbls): | 10000 | Max pressure during treatment (psi): | 5120 | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.34 | Type Of gas: | | Number Of staged intervals: | 1 | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.76 | Recycled water used in treatment (bbls): | 7863 | Total flowback volume recovered (bbls): | 3057 | Fresh water used in treatment (bbls): | 2137 | Disposition method For flowback: | RECYCLE | Total proppant used (lbs): | 0 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7932 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 8/15/2018 | Test Method: | FLOWING | Hours Tested: | 1 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 1 | BTU_GAS | 1080 | CALC_BBLS_H2O | 24 | CALC_MCF_GAS | 106 | CASING_PRESS | 1435 | MCF_GAS | 4 | TUBING_PRESS | 870 |
| Perforation Data: | Interval Top: | 7894 ft. | # Of Holes: | 24 | Interval Bottom: | 7972 ft. | Hole Size: | 0.37 in. |
|
Formation WFCM Formation Classification: GW Status: PR - 8/15/2018 Interval Top: 5938 ft. Interval Bottom: 7414 ft. Completed Information for Formation WILLIAMS FORK - CAMEO | 1st Production Date: | 7/20/2018 | Choke Size: | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 7/20/2018 | Treatment End Date: | 7/26/2018 | Treatment Summary: | 60,000 BBLS SLICKWATER; NO PROPPANT | Total fluid used in treatment (bbls): | 60000 | Max pressure during treatment (psi): | 7516 | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.34 | Type Of gas: | | Number Of staged intervals: | 6 | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.72 | Recycled water used in treatment (bbls): | 47175 | Total flowback volume recovered (bbls): | 24459 | Fresh water used in treatment (bbls): | 12825 | Disposition method For flowback: | RECYCLE | Total proppant used (lbs): | 0 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7932 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 8/15/2018 | Test Method: | FLOWING | Hours Tested: | 1 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 10 | BTU_GAS | 1080 | CALC_BBLS_H2O | 240 | CALC_MCF_GAS | 850 | CASING_PRESS | 1435 | MCF_GAS | 35 | TUBING_PRESS | 870 |
| Perforation Data: | Interval Top: | 5938 ft. | # Of Holes: | 180 | Interval Bottom: | 7414 ft. | Hole Size: | 0.37 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 65 |
Total Gas Produced (MCF) | 45981 |
GOR | 707400 |
GOR Determination | MCFE |
Average BOE per Day | 21.839 |
Average MCFE per Day | 126.697 |
Federal Financial Assurance | i | Y |
|
|