|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 3/26/2020 Measured TD: 8300 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 3/26/2020 | | Wellbore Permit | | | Permit #: | | Expiration Date: | 4/17/2015 | | Proposed Depth/Form: | 8400 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | STATE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: MSSP , Formation: MISSISSIPPIAN , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: PENN , Formation: PENNSYLVANIAN , Order: , Unit Acreage: , Drill Unit: | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 300 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: 0 ft., Bottom: 300 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 8400 ft., Weight: 17 , Citings Type: PLANNED | | Cement: | Sacks: 300, Top: 6500 ft., Bottom: 8400 ft. | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: PLANNED | | Cement: | Sacks: 100, Top: 4200 ft., Bottom: 4850 ft. |
| | |
| Wellbore Completed | | Completion Date: | 5/19/2013 | | Spud Date: | 4/29/2013 | Spud Date Is: | ACTUAL | | Measured TD: | 8300 ft. | Measured PB depth: | 8060 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | Compensated Density Compensated Neutron Gamma Ray
High Resoultion Induction
Radial Cement Bond Log | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 300 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 165, Top: 0 ft., Bottom: 300 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 8293 ft., Weight: 17 , Citings Type: ACTUAL | | Cement: | Sacks: 330, Top: 5885 ft., Bottom: 8240 ft., Determination Method: CBL | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4895 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 250, Top: 3104 ft., Bottom: 4895 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 3318 ft. | | | | | CODELL | 3844 ft. | | | | | CEDAR HILLS | 5564 ft. | | | | | LANSING | 6906 ft. | | | | | TORCH | 7270 ft. | | | | | PAWNEE A | 7303 ft. | | | | | CHEROKEE | 7370 ft. | | | Y | | MORROW V-11 | 8107 ft. | | | | | KEYES | 8130 ft. | | | |
Formation KEYES Formation Classification: OW Status: AB - 5/28/2013 Interval Top: 8174 ft. Interval Bottom: 8190 ft.| Completed Information for Formation KEYES | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | KEYES | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | ACID JOB | | Treatment Date: | 5/24/2013 | Treatment End Date: | 5/28/2013 | | Treatment Summary: | Acid Job: 12.5% HCL 38 bbl, 4% KCL 49 bbls | | Total fluid used in treatment (bbls): | 87 | Max pressure during treatment (psi): | 1500 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | 38 | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | 49 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: PIPELINE |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 8132 ft. | | Tubing Packer Depth: | 8132 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/24/2013 | Test Method: | SWAB | | Hours Tested: | 8 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 26 | | CALC_BBLS_H2O | 78 |
| | Perforation Data: | | Interval Top: | 8174 ft. | # Of Holes: | 64 | | Interval Bottom: | 8190 ft. | Hole Size: | 0.25 in. |
|
Formation MRV11 Formation Classification: OW Status: AB - 5/30/2013 Interval Top: 8108 ft. Interval Bottom: 8119 ft.| Completed Information for Formation MORROW V-11 | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | MORROW V-11 | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | ACID JOB | | Treatment Date: | 5/28/2013 | Treatment End Date: | 5/30/2013 | | Treatment Summary: | Acid Job: 12.5% HCL (26 bbl), 4% KCL (48 bbl) | | Total fluid used in treatment (bbls): | 74 | Max pressure during treatment (psi): | 2600 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | 26 | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | 48 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: PIPELINE |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 8064 ft. | | Tubing Packer Depth: | 8064 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/29/2013 | Test Method: | SWAB | | Hours Tested: | 8 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 26 | | CALC_BBLS_H2O | 78 |
| | Perforation Data: | | Interval Top: | 8108 ft. | # Of Holes: | 45 | | Interval Bottom: | 8119 ft. | Hole Size: | 0.25 in. |
|
Formation CHRK Formation Classification: OW Status: AB - 3/26/2020 Interval Top: 7384 ft. Interval Bottom: 7392 ft.| Completed Information for Formation CHEROKEE | | 1st Production Date: | 6/15/2013 | Choke Size: | | | Formation Name: | CHEROKEE | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | ACID JOB | | Treatment Date: | 5/30/2013 | Treatment End Date: | 5/31/2013 | | Treatment Summary: | Acid Job: 15% HCL (19 bbl), 2% KCL ( 46 bbl) | | Total fluid used in treatment (bbls): | 65 | Max pressure during treatment (psi): | 830 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | 19 | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | 46 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: PIPELINE |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 7441 ft. | | Tubing Packer Depth: | 7441 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/31/2013 | Test Method: | SWAB | | Hours Tested: | 8 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 23 | | BBLS_OIL | 16 | | CALC_BBLS_H2O | 69 | | CALC_BBLS_OIL | 48 | | GRAVITY_OIL | 35 |
| | Perforation Data: | | Interval Top: | 7384 ft. | # Of Holes: | 32 | | Interval Bottom: | 7392 ft. | Hole Size: | 0.25 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 03/26/2020 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|