|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 7/1/2020 Measured TD: 7810 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 7/1/2020 | | Wellbore Permit | VERTICAL | | Permit #: | | Expiration Date: | 10/20/2027 | | Proposed Depth/Form: | 7793 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: ABCK , Formation: ARBUCKLE , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: CHRK , Formation: CHEROKEE , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: LNSNG , Formation: LANSING , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: MRRW , Formation: MORROW , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: MRTN , Formation: MARMATON , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: PAWN , Formation: PAWNEE , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: TORCH , Formation: TORCH , Order: , Unit Acreage: , Drill Unit: | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 330 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 225, Top: 0 ft., Bottom: 330 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 7793 ft., Weight: 17 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: 6600 ft., Bottom: 7793 ft. | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4550 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 125, Top: 3820 ft., Bottom: 4550 ft. | | Casing: | String Type: STAGE TOOL, Hole Size: 7.875 in., Size: 5.5 in., Top: 4550 ft., Depth: 4551 ft., Weight: 17 , Citings Type: PLANNED | | Cement: | Sacks: 125, Top: 3850 ft., Bottom: 4550 ft. |
| | |
| Wellbore Completed | | Completion Date: | 6/23/2010 | | Spud Date: | 6/4/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 7810 ft. | Measured PB depth: | 7810 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | DUAL INDUCTION GUARD LOG GAMMA RAY/COMPENSATED DENSITY COMPENSATED NEUTRON GAMMA RAY DUAL SPACED CEMENT BOND LOG | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 330 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 225, Top: 0 ft., Bottom: 330 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 7793 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 6600 ft., Bottom: 7793 ft., Determination Method: CBL | | Additional Cement: | String Type: SURF , Top: 4550 ft., Depth: 4550 ft., Bottom: 3820 ft., Sacks: 125, Method: DV TOOL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 3109 ft. | | | | | CODELL | 3639 ft. | | | | | DAKOTA | 4089 ft. | | | | | SHAWNEE | 5681 ft. | | | | | LANSING | 6617 ft. | | | | | MARMATON | 6956 ft. | | | Y | | PAWNEE B | 7014 ft. | | | | | CHEROKEE | 7076 ft. | | | Y | | MORROW | 7570 ft. | | | |
Formation MRRW Formation Classification: OW Status: SI - 8/16/2010 Interval Top: 7720 ft. Interval Bottom: 7726 ft.| Completed Information for Formation MORROW | | 1st Production Date: | N/A | Choke Size: | 1.000 in. | | Formation Name: | MORROW | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/2/2010 | Test Method: | FLOWING | | Hours Tested: | 6 | Gas Type: | DRY | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 23 | | BTU_GAS | 450 | | CALC_BBLS_H2O | 92 | | CALC_MCF_GAS | 10000 | | CASING_PRESS | 2200 | | MCF_GAS | 2500 |
| | Perforation Data: | | Interval Top: | 7720 ft. | # Of Holes: | 32 | | Interval Bottom: | 7726 ft. | Hole Size: | 0.25 in. |
|
Formation CHRK Formation Classification: OG Status: AB - 10/24/2014 Interval Top: 7090 ft. Interval Bottom: 7100 ft.| Completed Information for Formation CHEROKEE | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CHEROKEE | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | ACID JOB | | Treatment Date: | 2/20/2014 | Treatment End Date: | 2/21/2014 | | Treatment Summary: | 2-18-2014 drill out CIBP @ 7000'. Drill out CIBP @ 7115' drill cement to 7020'.
2-20-2014 set CIBP @ 7115' with 2 sks cement. Perf Cherokee A formation 7090' - 7100'. Acid job 24 bbls 15% HCL, 42 bbls 2% KCL SWAB recover 66 bbls treatment then dry.
2-27-2014 acid job 38 bbls 15% HCL, 72 bbls 2% KCL, SWAB recover 65 bbls treatment and 39 bbls water
3-3-2014 set CIBP @ 7070' with 2 sks cement plug and abandon Cherokee A formation | | Total fluid used in treatment (bbls): | 176 | Max pressure during treatment (psi): | 800 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | 62 | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 170 | | Fresh water used in treatment (bbls): | 114 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: PIPELINE | | Formation Treatment | | Treatment Date: | 7/6/2010 | | Treatment Summary: | CHEROKEE B - ACID JOB 600 GAL 15% MCA 41 BBLS 2% KCL. THROUGH TUBING. |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 7046 ft. | | Tubing Packer Depth: | 7046 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/27/2014 | Test Method: | SWAB | | Hours Tested: | 8 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 13 | | CALC_BBLS_H2O | 39 |
| | Perforation Data: | | Interval Top: | 7090 ft. | # Of Holes: | 40 | | Interval Bottom: | 7100 ft. | Hole Size: | 0.25 in. |
|
Formation PAWNB Formation Classification: OG Status: PR - 7/1/2020 Interval Top: 7014 ft. Interval Bottom: 7030 ft.| Completed Information for Formation PAWNEE B | | 1st Production Date: | 3/15/2014 | Choke Size: | | | Formation Name: | PAWNEE B | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | ACID JOB | | Treatment Date: | 3/3/2014 | Treatment End Date: | 3/4/2014 | | Treatment Summary: | 3-3-2014 perf Pawnee B formation 7014, 7030'. Acid Job 38 bbls 15% HCL, 72 bbls 2% KCL, SWAB recover 60 bbls treatment | | Total fluid used in treatment (bbls): | 110 | Max pressure during treatment (psi): | 400 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | 38 | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 60 | | Fresh water used in treatment (bbls): | 72 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: PIPELINE | | Formation Treatment | | Treatment Date: | 1/19/2012 | | Treatment Summary: | Set CIBP at 7000 feet | | Formation Treatment | | Treatment Date: | 7/8/2010 | | Treatment Summary: | ACID JOB 800 GAL, 15% MCA 42 BBLS 2% KCL. THROUGH TUBING. |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 6964 ft. | | Tubing Packer Depth: | 6964 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/3/2014 | Test Method: | SWAB | | Hours Tested: | 8 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 35 | | BBLS_OIL | 4 | | BTU_GAS | 1400 | | CALC_BBLS_H2O | 105 | | CALC_BBLS_OIL | 12 | | CALC_MCF_GAS | 21 | | CASING_PRESS | 230 | | GRAVITY_OIL | 38 | | MCF_GAS | 7 | | TUBING_PRESS | 200 |
| | Perforation Data: | | Interval Top: | 7014 ft. | # Of Holes: | 64 | | Interval Bottom: | 7030 ft. | Hole Size: | 0.25 in. |
|
Formation TORCH Formation Classification: OG Status: AB - 10/24/2014 Interval Top: 6954 ft. Interval Bottom: 6966 ft.| Completed Information for Formation TORCH | | 1st Production Date: | 3/1/2012 | Choke Size: | | | Formation Name: | TORCH | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 2/17/2014 | Treatment End Date: | N/A | | Treatment Summary: | 2-17-2014 set packer @ 6857' squeeze off perfs 6954' - 6966' with 100 sks cement load backside test held 500# psi
| | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Date: | 1/19/2012 | | Treatment Summary: | Acid Job 1200 gal 15% HCL 42 bbl 2% KCL |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 6857 ft. | | Tubing Packer Depth: | 6857 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 30 | | BBLS_OIL | 8 | | CALC_BBLS_H2O | 90 | | CALC_BBLS_OIL | 24 | | GRAVITY_OIL | 35 |
| | Perforation Data: | | Interval Top: | 6954 ft. | # Of Holes: | 48 | | Interval Bottom: | 6966 ft. | Hole Size: | 0.25 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 1082 |
| Total Gas Produced (MCF) | 550 |
| GOR | 508 |
| GOR Determination | BOE |
| Average BOE per Day | 3.223 |
| Average MCFE per Day | 18.681 |
| Federal Financial Assurance | i | |
|
|