Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-073-06387
Well Classification: OW Status: PR - 10/1/2025
Well Name/No:aloha mula #3
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:WIEPKING-FULLERTON ENERGY LLC - 96340
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/1/2025
FacilityID:413101LocationID:413090
County:LINCOLN #073Location:NESW 19 10S55W 6
Field:GREAT PLAINS - #32756Elevation:5259 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1982FSL  1972 FWLLat/Long: 39.162350 / -103.596300Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.162350 / -103.596300Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 10/1/2025             Measured TD: 7850 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 10/1/2025
Wellbore Permit
Permit #: Expiration Date:6/19/2013
Proposed Depth/Form:8000 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: ABCK , Formation: ARBUCKLE , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: CHRK , Formation: CHEROKEE , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: KEYES , Formation: KEYES , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: LNSNG , Formation: LANSING , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: MRRW , Formation: MORROW , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: MRTN , Formation: MARMATON , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 302 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 175, Top: 0 ft., Bottom: 302 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 8000 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 300, Top: 6500 ft., Bottom: 8000 ft.

Wellbore Completed
Completion Date:8/5/2011
Spud Date:7/21/2011Spud Date Is:ACTUAL
Measured TD:7850 ft.Measured PB depth:7341 ft.
True Vertical TD:True Vertical PB depth:
Log Types:COMPENSATED NEUTRON/DENSITY/GAMMA RAY, DUAL INDUCTION
Log Types:High Resoulution Induction Radial Cement Bond Log
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 302 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 175, Top: 0 ft., Bottom: 302 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 7341 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 125, Top: 6300 ft., Bottom: 7341 ft., Determination Method: CBL
Additional Cement:String Type: 1ST , Top: 3070 ft., Depth: 4566 ft., Bottom: 4566 ft., Sacks: 250, Method: DV TOOL
FormationInterval TopLog BottomCoredDSTs
NIOBRARA3160 ft.
CODELL3709 ft.
DAKOTA4150 ft.
CHEYENNE4403 ft.NN
SHAWNEE6625 ft.
LANSING-KANSAS CITY6653 ft.NN
LANSING6653 ft.
MARMATON7002 ft. Y
PAWNEE7036 ft. Y
CHEROKEE7115 ft.

Formation CHRK                     Formation Classification:  OW                     Status:  AB - 8/17/2011                 Interval Top: 7156 ft.    Interval Bottom: 7170 ft.

 Completed Information for Formation CHEROKEE
1st Production Date:N/AChoke Size: 
Formation Name:CHEROKEECommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:8/15/2011
Treatment Summary:Acid Job 1400 gal acid 15% HCL, 43 bbls 2% KCL
Tubing Size:2.875 in.Tubing Setting Depth:7086 ft.
Tubing Packer Depth:7086 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CHRK.
Perforation Data:
Interval Top:7156 ft.# Of Holes:52
Interval Bottom:7170 ft.Hole Size:0.25 in.

Formation PAWN                     Formation Classification:  OW                     Status:  PR - 10/1/2025                 Interval Top: 7048 ft.    Interval Bottom: 7054 ft.

 Completed Information for Formation PAWNEE
1st Production Date:9/1/2011Choke Size: 
Formation Name:PAWNEECommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/17/2011
Treatment Summary:Acid job 600 gal 15% acid, 42 bbls 3% KCL
Tubing Size:2.875 in.Tubing Setting Depth:7084 ft.
Tubing Packer Depth:6978 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/17/2011Test Method:SWAB
Hours Tested:8Gas Type:DRY
Gas Disposal:VENTED
Test TypeMeasure
BBLS_H2O 30
BBLS_OIL 14
BTU_GAS 1500
CALC_BBLS_H2O 90
CALC_BBLS_OIL 42
CALC_MCF_GAS 30
GRAVITY_OIL 35
MCF_GAS 10
Perforation Data:
Interval Top:7048 ft.# Of Holes:24
Interval Bottom:7054 ft.Hole Size:0.25 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)998
Total Gas Produced (MCF)1029
GOR1031
GOR DeterminationBOE
Average BOE per Day3.217
Average MCFE per Day18.697

 Federal Financial Assurance  i 

 Tribal Well  i No