Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-09633
Well Classification: CBM Status: PR - 1/27/2009
Well Name/No:APACHE CANYON #04-01
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/27/2009
FacilityID:297298LocationID:309511
County:LAS ANIMAS #071Location:NENE 4 34S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:7591 ft.
Basin:RATON BASIN  
Planned Location:386FNL  1279 FELLat/Long: 37.119419 / -104.888498Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.119449 / -104.888504Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 1/27/2009             Measured TD: 2250 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 1/27/2009
Wellbore Permit
Permit #:20083505 Expiration Date:7/21/2009
Proposed Depth/Form:2141 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:STATE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: S.C. 1.2, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 1433 ft., Weight: 15.5 , Citings Type: PLANNED
Cement:Sacks: 230, Top: 0 ft., Bottom: 1433 ft.

Wellbore Completed
Completion Date:8/5/2008
Spud Date:8/2/2008Spud Date Is:ACTUAL
Measured TD:2250 ft.Measured PB depth:2177 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DUAL INDUC, COMP DENSITY NEUTRON W/GR & CALIPER, GR/CBL/CCL (2)
Casing:String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 47 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 81, Top: 0 ft., Bottom: 50 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 499 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 244, Top: 0 ft., Bottom: 505 ft., Determination Method: CBL
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2225 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 254, Top: 1306 ft., Bottom: 2250 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: 5.5 in., Top: , Depth: , Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method: CBL
Casing:String Type: 2ND, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL
Cement:Sacks: 172, Top: 0 ft., Bottom: 1280 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1572 ft.NN
VERMEJO COAL1572 ft.1952 ft.NN
TRINIDAD1952 ft.2121 ft.NN
PIERRE2121 ft.2250 ft.NN

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 1/27/2009                 Interval Top: 524 ft.    Interval Bottom: 1870 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:1/27/2009Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/7/2009
Treatment Summary:ACIDIZED W/5,200 GALS 15% HCL ACID. FRAC'D W/236,315 GALS 20# DELTA 140 W/SANDWEDGE OS CARRYING 151,914# 16/30 BRADY SD. AND 282,470# 12/20 BRADY SD.
Tubing Size:2.875 in.Tubing Setting Depth:2 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/27/2009Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 95
BBLS_OIL 0
BTU_GAS 998
CALC_BBLS_H2O 95
CALC_BBLS_OIL 0
CALC_GOR 0
CALC_MCF_GAS 0
CASING_PRESS 5
GRAVITY_OIL 1
MCF_GAS 0
TUBING_PRESS 3
Perforation Data:
Interval Top:524 ft.# Of Holes:118
Interval Bottom:1870 ft.Hole Size:0.45 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)38349
GOR
GOR DeterminationMCFE
Average BOE per Day18.124
Average MCFE per Day105.100

 Federal Financial Assurance  i 

 Tribal Well  i No