Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-09567
Well Classification: CBM Status: PR - 7/1/2011
Well Name/No:HILL RANCH #31-14
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/1/2011
FacilityID:295530LocationID:309464
County:LAS ANIMAS #071Location:SESW 31 34S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:8470 ft.
Planned Location:1134FSL  1649 FWLLat/Long: 37.036647 / -104.931988Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.036641 / -104.932026Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 7/1/2011             Measured TD: 2920 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 7/1/2011
Wellbore Permit
Permit #:20091728 Expiration Date:4/27/2010
Proposed Depth/Form:2920 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:1/30/2010
Spud Date:1/26/2010Spud Date Is:ACTUAL
Measured TD:2920 ft.Measured PB depth:2859 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DUAL INDUCTION, COMPENSATED DENSITY/NEUTRON, CBL
Casing:String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 47 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 84, Top: 0 ft., Bottom: 50 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 456 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 235, Top: 0 ft., Bottom: 460 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2904 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 406, Top: 0 ft., Bottom: 2920 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.NN
VERMEJO COAL2432 ft.NN
TRINIDAD2773 ft.NN

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 8/1/2011                  Interval Top: 841 ft.    Interval Bottom: 2690 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:5/6/2010Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/23/2010
Treatment Summary:ACIDIZED WITH 7150 GALS 15% HCI ACID. FRACD WITH 317535 GALS 20# DELTA 140 WITH SANDWEDGE OS CARRYING 47009# 16/30 BRADY SD AND 428636# 12/20 BRADY SD.
Tubing Size:2.875 in.Tubing Setting Depth:2781 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/9/2010Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 107
BTU_GAS 992
CALC_BBLS_H2O 107
CASING_PRESS 2
TUBING_PRESS 3
Perforation Data:
Interval Top:841 ft.# Of Holes:150
Interval Bottom:2690 ft.Hole Size:0.45 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)8256
GOR
GOR DeterminationMCFE
Average BOE per Day3.901
Average MCFE per Day22.616

 Federal Financial Assurance  i 

 Tribal Well  i No