Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-09560
Well Classification: CBM Status: PR - 7/10/2009
Well Name/No:HILL RANCH #01-02
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/10/2009
FacilityID:295517LocationID:309458
County:LAS ANIMAS #071Location:NWNE 1 35S68W 6
Field:PURGATOIRE RIVER - #70830Elevation:8627 ft.
Planned Location:820FNL  1919 FELLat/Long: 37.031244 / -104.944204Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.031269 / -104.944197Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 7/10/2009             Measured TD: 2637 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 7/10/2009
Wellbore Permit
Permit #:20081045 Expiration Date:4/13/2009
Proposed Depth/Form:2577 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: 2ND, Hole Size: 7.875 in., Size: 55.5 in., Top: , Depth: 1895 ft., Weight: 15.5 , Citings Type: PLANNED
Cement:Sacks: 300, Top: 0 ft., Bottom: 1895 ft.

Wellbore Completed
Completion Date:3/14/2009
Spud Date:3/9/2009Spud Date Is:ACTUAL
Measured TD:2637 ft.Measured PB depth:2543 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DUAL INDUC, COMP DENSITY NEUTRON, CBL, GR/NEU, COMP NEU
Casing:String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 44 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 60, Top: 0 ft., Bottom: 60 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 454 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 195, Top: 0 ft., Bottom: 460 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2585 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 116, Top: 1790 ft., Bottom: 2637 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 1782 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 260, Top: 590 ft., Bottom: 1782 ft., Determination Method: CBL
Additional Cement:String Type: SURF , Top: 0 ft., Depth: 545 ft., Bottom: 545 ft., Sacks: 120, Method: STAGE TOOL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.2059 ft.NN
VERMEJO COAL2059 ft.2320 ft.NN
TRINIDAD2320 ft.2411 ft.NN
PIERRE2411 ft.2637 ft.NN

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 7/10/2009                 Interval Top: 557 ft.    Interval Bottom: 2285 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:7/7/2009Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/17/2009
Treatment Summary:ACIDIZED W/5,400 GALS 15% HCL ACID. FRAC'D W/283,021 GALS 20# DELTA 140 W/SANDWEDGE OS CARRYING 37,800# 16/30 BRADY SD & 424,900# 12/20 BRADY SD.
Tubing Size:2.875 in.Tubing Setting Depth:2394 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/10/2009Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 93
BBLS_OIL 0
BTU_GAS 1005
CALC_BBLS_H2O 93
CALC_BBLS_OIL 0
CALC_GOR 0
CALC_MCF_GAS 4
CASING_PRESS 3
MCF_GAS 4
TUBING_PRESS 2
Perforation Data:
Interval Top:557 ft.# Of Holes:118
Interval Bottom:2285 ft.Hole Size:0.45 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)19340
GOR
GOR DeterminationMCFE
Average BOE per Day9.137
Average MCFE per Day53.001

 Federal Financial Assurance  i 

 Tribal Well  i No