Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-09448
Well Classification: CBM Status: PR - 6/10/2008
Well Name/No:HILL RANCH EAST #23-07
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date6/10/2008
FacilityID:293796LocationID:309367
County:LAS ANIMAS #071Location:SWNE 23 34S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:7844 ft.
Planned Location:1364FNL  2623 FELLat/Long: 37.073206 / -104.856898Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.073196 / -104.856891Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 6/10/2008             Measured TD: 2550 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 6/10/2008
Wellbore Permit
Permit #:20075852 Expiration Date:11/28/2008
Proposed Depth/Form:2434 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:4/16/2008
Spud Date:4/13/2008Spud Date Is:ACTUAL
Measured TD:2550 ft.Measured PB depth:2481 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DUAL IND,COMP DENSITY NEUTRON W/GR & CALIPER, CBL (2)
Casing:String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 46 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 85, Top: 0 ft., Bottom: 52 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 490 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 260, Top: 0 ft., Bottom: 505 ft., Determination Method: CBL
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2527 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 348, Top: 864 ft., Bottom: 2550 ft., Determination Method: CBL
Casing:String Type: 2ND, Hole Size: , Size: 5.5 in., Top: , Depth: , Weight: , Citings Type: ACTUAL
Cement:Sacks: 250, Top: 10 ft., Bottom: 870 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1910 ft.NN
VERMEJO COAL1910 ft.2225 ft.NN
TRINIDAD2225 ft.2550 ft.NN

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 6/10/2008                 Interval Top: 510 ft.    Interval Bottom: 1766 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:N/AChoke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/20/2008
Treatment Summary:ACIDIZED W/4,000 GALS 15% HCL. FRAC'D W/204,056 GALS 20# DELTA 140 W/SANDWEDGE OS CARRYING 88,795# 16/30 ARIZONA SAND & 390,529# 12/20 BRADY SAND
Tubing Size:2.875 in.Tubing Setting Depth:1902 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/10/2008Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 85
BTU_GAS 1009
CALC_BBLS_H2O 85
CALC_BBLS_OIL 0
CALC_MCF_GAS 418
CASING_PRESS 40
GRAVITY_OIL 1
MCF_GAS 418
TUBING_PRESS 3
Perforation Data:
Interval Top:510 ft.# Of Holes:120
Interval Bottom:1766 ft.Hole Size:0.45 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)37849
GOR
GOR DeterminationMCFE
Average BOE per Day17.873
Average MCFE per Day103.672

 Federal Financial Assurance  i 

 Tribal Well  i No