Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-09109
Well Classification: CBM Status: PR - 7/24/2007
Well Name/No:GOLDEN EAGLE #30-16
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/24/2007
FacilityID:288301LocationID:309120
County:LAS ANIMAS #071Location:SESE 30 33S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:7419 ft.
Basin:RATON BASIN  
Planned Location:294FSL  881 FELLat/Long: 37.136930 / -104.921480Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.136890 / -104.921400Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 7/24/2007             Measured TD: 2052 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 7/24/2007
Wellbore Permit
Permit #:20065347 Expiration Date:12/7/2007
Proposed Depth/Form:2000 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:STATE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 1274 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 220, Top: 0 ft., Bottom: 1274 ft.

Wellbore Completed
Completion Date:2/24/2007
Spud Date:2/22/2007Spud Date Is:ACTUAL
Measured TD:2052 ft.Measured PB depth:2005 ft.
True Vertical TD:True Vertical PB depth:
Log Types:COMBO DUAL IND, COMP DEN,NEU LOGS W/GR&CALIPER,GR/CBL/CCL
Casing:String Type: CONDUCTOR, Hole Size: 15 in., Size: 12.75 in., Top: 0 ft., Depth: 22 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 9, Top: 0 ft., Bottom: 22 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 500 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 249, Top: 0 ft., Bottom: 500 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2051 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 340, Top: 596 ft., Bottom: 2051 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 562 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 76, Top: 0 ft., Bottom: , Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1296 ft.NN
VERMEJO COAL1386 ft.1778 ft.NN
TRINIDAD1778 ft.2052 ft.NN

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 7/24/2007                 Interval Top: 548 ft.    Interval Bottom: 1755 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:7/20/2007Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/4/2007
Treatment Summary:ACIDIZE W/4000 GALS 15% HCL ACID. FRAC'D W/209,165 GALS 20# DELTA 140 W/SANDWEDGE OS CARRYING 26,000# 16/30 BRADY SAND AND 453,358# 12/20 BRADY SAND.
Tubing Size:2.875 in.Tubing Setting Depth:1835 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/24/2007Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 197
BTU_GAS 1009
CALC_BBLS_H2O 197
CALC_MCF_GAS 156
CASING_PRESS 6
MCF_GAS 156
TUBING_PRESS 3
Perforation Data:
Interval Top:548 ft.# Of Holes:115
Interval Bottom:1755 ft.Hole Size:0.45 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)15647
GOR
GOR DeterminationMCFE
Average BOE per Day7.401
Average MCFE per Day42.908

 Federal Financial Assurance  i 

 Tribal Well  i No