Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-09108
Well Classification: CBM Status: PR - 9/1/2025
Well Name/No:GOLDEN EAGLE #31-2
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/1/2025
FacilityID:288302LocationID:309119
County:LAS ANIMAS #071Location:NWNE 31 33S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:7525 ft.
Basin:RATON BASIN  
Planned Location:722FNL  2074 FELLat/Long: 37.133810 / -104.926220Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.133790 / -104.926200Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 9/1/2025             Measured TD: 2150 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 9/1/2025
Wellbore Permit
Permit #:20065346 Expiration Date:12/7/2007
Proposed Depth/Form:2075 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:STATE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 1325 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 230, Top: 0 ft., Bottom: 1325 ft.

Wellbore Completed
Completion Date:2/26/2007
Spud Date:2/24/2007Spud Date Is:ACTUAL
Measured TD:2150 ft.Measured PB depth:2096 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DUAL IND; COM DENSITY NEUTRON W/GR&CALIPER/GR/CBL/CCL
Casing:String Type: CONDUCTOR, Hole Size: 15 in., Size: 12.75 in., Top: 0 ft., Depth: 23 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 8, Top: 0 ft., Bottom: 23 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 13.375 in., Size: 8.625 in., Top: 0 ft., Depth: 500 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 238, Top: 1890 ft., Bottom: 500 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2141 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 355, Top: 0 ft., Bottom: 2141 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 1860 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 110, Top: , Bottom: , Determination Method: CBL
Additional Cement:String Type: 1ST , Top: 1392 ft., Depth: 1860 ft., Bottom: 1854 ft., Sacks: 110, Method: PERF & PUMP
Additional Cement:String Type: 1ST , Top: 0 ft., Depth: 110 ft., Bottom: 1854 ft., Sacks: , Method: PERF & PUMP
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1413 ft.NN
VERMEJO COAL1480 ft.1886 ft.NN
TRINIDAD1886 ft.2151 ft.NN

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 9/1/2025                  Interval Top: 575 ft.    Interval Bottom: 1841 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:7/10/2007Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/26/2007
Treatment Summary:ACIDEIZED W/ 4000 GALS 15% HCI ACID FRACD W/ 206,151 GALS 20# DELTA 140 W/ SANDWEDGE OS CARRYING 136,057# 16/30 AND 289,060# 12/20 BRADY SAND
Tubing Size:2.875 in.Tubing Setting Depth:1945 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/13/2007Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 409
BBLS_OIL 0
BTU_GAS 1008
CALC_BBLS_H2O 409
CASING_PRESS 30
GRAVITY_OIL 559
MCF_GAS 0
TUBING_PRESS 5
Perforation Data:
Interval Top:575 ft.# Of Holes:124
Interval Bottom:1841 ft.Hole Size:0.45 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)5191
GOR
GOR DeterminationMCFE
Average BOE per Day2.440
Average MCFE per Day14.154

 Federal Financial Assurance  i 

 Tribal Well  i No