Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-08813
Well Classification: CBM Status: PR - 2/1/2018
Well Name/No:APACHE CANYON #26-2
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date2/1/2018
FacilityID:285127LocationID:308923
County:LAS ANIMAS #071Location:NWNE 26 34S68W 6
Field:PURGATOIRE RIVER - #70830Elevation:8044 ft.
Planned Location:234FNL  2495 FELLat/Long: 37.061710 / -104.964302Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.061699 / -104.964313Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 2/1/2018             Measured TD: 1945 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 2/1/2018
Wellbore Permit
Permit #:20061872 Expiration Date:6/12/2007
Proposed Depth/Form:1850 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:STATE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 1221 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 220, Top: 0 ft., Bottom: 1221 ft.

Wellbore Completed
Completion Date:1/18/2007
Spud Date:1/16/2007Spud Date Is:ACTUAL
Measured TD:1945 ft.Measured PB depth:1848 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DUAL IND./COMP DENSITY NEUTRON W/GR&CALIPER, GR/CBL/CCL
Casing:String Type: CONDUCTOR, Hole Size: 15 in., Size: 12.75 in., Top: 0 ft., Depth: 25 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 10, Top: 0 ft., Bottom: 25 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 500 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 281, Top: 0 ft., Bottom: 500 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 1893 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 280, Top: 765 ft., Bottom: 1893 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL
Cement:Sacks: 121, Top: 62 ft., Bottom: 650 ft., Determination Method:
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1280 ft.NN
VERMEJO COAL1399 ft.1694 ft.NN
TRINIDAD1694 ft.1941 ft.NN

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 2/1/2018                  Interval Top: 535 ft.    Interval Bottom: 1672 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:3/30/2007Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/19/2007
Treatment Summary:ACIDIZED W/2350 GALS 15% HCL ACID. FRAC'D W/163,130 GALS 20# DELTA 140 W/SANDWEDGE OS CARRYING 14,000# 16/30 BRADY SAND AND 336,105# 12/20 BRADY SAND.
Tubing Size:2.875 in.Tubing Setting Depth:1774 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/30/2007Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 937
CASING_PRESS 2
GRAVITY_OIL 1
MCF_GAS 0
TUBING_PRESS 2
Perforation Data:
Interval Top:535 ft.# Of Holes:82
Interval Bottom:1672 ft.Hole Size:0.45 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)29367
GOR
GOR DeterminationMCFE
Average BOE per Day13.871
Average MCFE per Day80.458

 Federal Financial Assurance  i 

 Tribal Well  i No