Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-08790
Well Classification: CBM Status: PR - 3/1/2021
Well Name/No:APACHE CANYON #6-8
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/1/2021
FacilityID:284724LocationID:308904
County:LAS ANIMAS #071Location:SENE 6 34S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:8033 ft.
Basin:RATON BASIN  
Planned Location:1751FNL  988 FELLat/Long: 37.115701 / -104.923702Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.115790 / -104.923711Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 3/1/2021             Measured TD: 2610 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 3/1/2021
Wellbore Permit
Permit #:20061403 Expiration Date:5/11/2007
Proposed Depth/Form:2490 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:STATE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 1804 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 140, Top: 0 ft., Bottom: 1804 ft.

Wellbore Completed
Completion Date:7/21/2006
Spud Date:7/17/2006Spud Date Is:ACTUAL
Measured TD:2610 ft.Measured PB depth:2582 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CBL, CD/CNL, DIL
Casing:String Type: CONDUCTOR, Hole Size: 15 in., Size: 12.75 in., Top: , Depth: 23 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 11, Top: 0 ft., Bottom: 23 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: , Depth: 624 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 423, Top: 0 ft., Bottom: 624 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 2583 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 155, Top: 1774 ft., Bottom: 2583 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 1774 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 280, Top: 1380 ft., Bottom: 1774 ft., Determination Method: CBL
Casing:String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: 1350 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 190, Top: 0 ft., Bottom: 1380 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1844 ft.NN
VERMEJO COAL1954 ft.2328 ft.NN
TRINIDAD2328 ft.NN

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 3/1/2021                  Interval Top: 797 ft.    Interval Bottom: 2323 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:10/16/2006Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/11/2006
Treatment Summary:ACIDIZED W/3700 GALS 15% HCI ACID. FRAC'D W/253,262 GALS 20# DELTA 140 W/EXPEDDITE & SANDWEDGE NT CARRYING 21,400# 16/30 BRADY SAND AND 468,666 12/20 BRADY SAND
Tubing Size:2.875 in.Tubing Setting Depth:2423 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/18/2006Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 82
BTU_GAS 1002
CALC_BBLS_H2O 82
CASING_PRESS 7
TUBING_PRESS 3
Perforation Data:
Interval Top:797 ft.# Of Holes:105
Interval Bottom:2323 ft.Hole Size:0.4 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)14132
GOR
GOR DeterminationMCFE
Average BOE per Day6.671
Average MCFE per Day38.700

 Federal Financial Assurance  i 

 Tribal Well  i No