Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-08789
Well Classification: CBM Status: SI - 1/1/2026
Well Name/No:APACHE CANYON #6-2
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date1/1/2026
FacilityID:284725LocationID:308903
County:LAS ANIMAS #071Location:NWNE 6 34S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:8149 ft.
Basin:RATON BASIN  
Planned Location:438FNL  2516 FELLat/Long: 37.119312 / -104.928943Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.119262 / -104.928804Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: SI - 1/1/2026             Measured TD: 2665 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        SI - 1/1/2026
Wellbore Permit
Permit #:20061404 Expiration Date:5/11/2007
Proposed Depth/Form:2650 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:STATE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 1920 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 330, Top: 0 ft., Bottom: 1920 ft.

Wellbore Completed
Completion Date:7/23/2006
Spud Date:7/20/2006Spud Date Is:ACTUAL
Measured TD:2665 ft.Measured PB depth:2579 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DUAL INDUCTION; COMP DENSITY/NEUTRON W/CALIPER; CBL/GR/CCL
Casing:String Type: CONDUCTOR, Hole Size: 15 in., Size: 12.75 in., Top: 0 ft., Depth: 23 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 11, Top: 0 ft., Bottom: 23 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 618 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 281, Top: 0 ft., Bottom: 618 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2626 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 450, Top: 130 ft., Bottom: 2626 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON SAND0 ft.1947 ft.NN
VERMEJO COAL2036 ft.2405 ft.NN
TRINIDAD2405 ft.NN

Formation RT-VJ                   Formation Classification:  GW                   Status:  SI - 1/1/2026                  Interval Top: 877 ft.    Interval Bottom: 2378 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:9/12/2006Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/23/2006
Treatment Summary:ACIDIZED W/6100 GALS 15% HCI ACID. FRAC'D W/290,123 GALS DELTA 140 W/SANDWEDGE NT CARRYING 33,300# 16/30 BRADY SAND AND 440,200# 12/20 BRADY SAND.
Tubing Size:2.875 in.Tubing Setting Depth:2441 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/13/2006Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 108
BTU_GAS 994
CALC_BBLS_H2O 108
CALC_GOR 0
CASING_PRESS 11
TUBING_PRESS 3
Perforation Data:
Interval Top:877 ft.# Of Holes:130
Interval Bottom:2378 ft.Hole Size:0.4 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
02/2025 - 01/2026

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)77
GOR
GOR DeterminationMCFE
Average BOE per Day0.036
Average MCFE per Day0.214

 Federal Financial Assurance  i 

 Tribal Well  i No