|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 4/1/2025 Measured TD: 1950 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 4/1/2025 | | Wellbore Permit | | | Permit #: | 20055114 | Expiration Date: | 2/21/2007 | | Proposed Depth/Form: | 1825 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 3/11/2006 | | Spud Date: | 3/9/2006 | Spud Date Is: | ACTUAL | | Measured TD: | 1950 ft. | Measured PB depth: | 1866 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | GR/CBL/CCL | | Casing: | String Type: CONDUCTOR, Hole Size: 15 in., Size: 12.75 in., Top: 0 ft., Depth: 31 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 30, Top: 0 ft., Bottom: 31 ft., Determination Method: CBL | | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 495 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 260, Top: 0 ft., Bottom: 495 ft., Determination Method: CBL | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 1914 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 300, Top: 0 ft., Bottom: 1914 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | RATON COAL | 0 ft. | 1164 ft. | N | N | | RATON SAND | 1164 ft. | 1273 ft. | N | N | | VERMEJO COAL | 1273 ft. | 1687 ft. | N | N | | TRINIDAD | 1687 ft. | 1944 ft. | N | N |
Formation RT-VJ Formation Classification: GW Status: PR - 4/1/2025 Interval Top: 1323 ft. Interval Bottom: 1638 ft.| Completed Information for Formation RATON-VERMEJO COALS | | 1st Production Date: | 1/10/2007 | Choke Size: | | | Formation Name: | RATON-VERMEJO COALS | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/17/2006 | | Treatment Summary: | ACIDIZED W/ 2750 GALS 15% HCI ACID. FRAC'S W/ 87,552 GALS 20# DELTA 140 W/SANDWEDGE NT CARRYING 144,184# 16/30 BRADY SAND. |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 1726 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/12/2007 | Test Method: | PUMPING | | Hours Tested: | 24 | Gas Type: | COAL GAS | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 108 | | BBLS_OIL | 0 | | BTU_GAS | 1000 | | CALC_BBLS_H2O | 108 | | CALC_BBLS_OIL | 0 | | CALC_MCF_GAS | 3 | | CASING_PRESS | 3 | | GRAVITY_OIL | 1 | | MCF_GAS | 3 | | TUBING_PRESS | 6 |
| | Perforation Data: | | Interval Top: | 1323 ft. | # Of Holes: | 40 | | Interval Bottom: | 1638 ft. | Hole Size: | 0.45 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 10/2024 - 09/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 1644 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.774 |
| Average MCFE per Day | 4.480 |
| Federal Financial Assurance | i | |
|
|