|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 4/1/2021 Measured TD: 2150 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 4/1/2021 | | Wellbore Permit | | | Permit #: | 20054306 | Expiration Date: | 1/10/2007 | | Proposed Depth/Form: | 2050 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | STATE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 2/24/2006 | | Spud Date: | 2/22/2006 | Spud Date Is: | ACTUAL | | Measured TD: | 2150 ft. | Measured PB depth: | 2089 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | DUAL INDUCTION; COMPENSATED DENSITY/NEUTRON/GR; CBL | | Casing: | String Type: CONDUCTOR, Hole Size: 15 in., Size: 12.75 in., Top: 0 ft., Depth: 24 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 9, Top: 0 ft., Bottom: 24 ft., Determination Method: CALC | | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 230 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 125, Top: 0 ft., Bottom: 230 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2137 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 393, Top: 0 ft., Bottom: 2137 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | RATON COAL | 0 ft. | 1314 ft. | N | N | | RATON-VERMEJO COALS | 1314 ft. | 1420 ft. | N | N | | VERMEJO COAL | 1420 ft. | 1813 ft. | N | N | | TRINIDAD | 1813 ft. | 2145 ft. | N | N |
Formation VRMJ Formation Classification: GW Status: CM - 7/21/2006 Interval Top: 1317 ft. Interval Bottom: 1787 ft.| Completed Information for Formation VERMEJO COAL | | 1st Production Date: | 7/11/2006 | Choke Size: | | | Formation Name: | VERMEJO COAL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/21/2006 | | Treatment Summary: | ACIDIZED W/3250 GALS 15% HCI ACID. FRAC'D W/324,748 GALS 20# DELTA 140 CARRYING 90,000# 16/30 AND 703,035 12/20 BRANDY SD. |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 1894 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/21/2006 | Test Method: | PUMPING | | Hours Tested: | 24 | Gas Type: | COAL GAS | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 129 | | BBLS_OIL | 0 | | BTU_GAS | 1091 | | CALC_BBLS_H2O | 129 | | CALC_BBLS_OIL | 0 | | CALC_MCF_GAS | 71 | | CASING_PRESS | 9 | | GRAVITY_OIL | 1 | | MCF_GAS | 71 | | TUBING_PRESS | 6 |
| | Perforation Data: | | Interval Top: | 1317 ft. | # Of Holes: | 65 | | Interval Bottom: | 1787 ft. | Hole Size: | 0.41 in. |
|
Formation RT-VJ Formation Classification: GW Status: PR - 4/1/2021 Interval Top: 1314 ft. Interval Bottom: 1787 ft.| Completed Information for Formation RATON-VERMEJO COALS | | 1st Production Date: | 7/21/2006 | Choke Size: | | | Formation Name: | RATON-VERMEJO COALS | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation RT-VJ. |
| | No Perforation Data was found for formation RT-VJ. |
|
Formation RTON Formation Classification: GW Status: CM - 7/21/2006 Interval Top: 422 ft. Interval Bottom: 723 ft.| Completed Information for Formation RATON COAL | | 1st Production Date: | 7/11/2006 | Choke Size: | | | Formation Name: | RATON COAL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/12/2006 | | Treatment Summary: | ACIDIZED W/1100 GALS 15% HCI ACID. FRAC'D W/140,400 GALS 20# DELTA 140 S/SANDWEDGE NT CARRYING 9700# 16/30 AND 272,000# 12/20 BRANDY SAND. |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 1894 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/21/2006 | Test Method: | PUMPING | | Hours Tested: | 24 | Gas Type: | COAL GAS | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 129 | | BBLS_OIL | 0 | | BTU_GAS | 1091 | | CALC_BBLS_H2O | 129 | | CALC_BBLS_OIL | 0 | | CALC_MCF_GAS | 71 | | CASING_PRESS | 9 | | GRAVITY_OIL | 1 | | MCF_GAS | 71 | | TUBING_PRESS | 6 |
| | Perforation Data: | | Interval Top: | 422 ft. | # Of Holes: | 39 | | Interval Bottom: | 723 ft. | Hole Size: | 0.4 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 13399 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 6.334 |
| Average MCFE per Day | 36.722 |
| Federal Financial Assurance | i | |
|
|