Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-08481
Well Classification: CBM Status: PR - 5/1/2021
Well Name/No:APACHE CANYON #13-6
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/1/2021
FacilityID:279260LocationID:308701
County:LAS ANIMAS #071Location:SENW 13 34S68W 6
Field:PURGATOIRE RIVER - #70830Elevation:8190 ft.
Basin:RATON BASIN  
Planned Location:2063FNL  1456 FWLLat/Long: 37.085853 / -104.950791Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.085750 / -104.950710Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 5/1/2021             Measured TD: 2340 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 5/1/2021
Wellbore Permit
Permit #:20052411 Expiration Date:8/10/2006
Proposed Depth/Form:2100 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:STATE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:9/24/2005
Spud Date:8/20/2005Spud Date Is:ACTUAL
Measured TD:2340 ft.Measured PB depth:2250 ft.
True Vertical TD:True Vertical PB depth:
Log Types:AIL/TLD/CNL/GR/CBL
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: , Depth: 204 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 108, Top: 0 ft., Bottom: 204 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 2295 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 410, Top: 1024 ft., Bottom: 2295 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 1024 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1582 ft.NN
VERMEJO COAL1701 ft.2046 ft.NN
TRINIDAD2046 ft.2318 ft.NN

Formation RTON                     Formation Classification:  GW                     Status:  PR - 5/1/2021                  Interval Top: 579 ft.    Interval Bottom: 915 ft.

 Completed Information for Formation RATON COAL
1st Production Date:3/12/2006Choke Size: 
Formation Name:RATON COALCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/23/2006
Treatment Summary:ACIDIZED W/1000 GALS 15% HCL ACID. FRAC'D W/134,328 GALS 20# DELTA 140 W/SANDWEDGE NT CARRYING 27,800# 16/30 & 316,000# 12/20 BRADY SAND.
Tubing Size:2.875 in.Tubing Setting Depth:2102 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/13/2006Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 74
BTU_GAS 1137
CALC_BBLS_H2O 74
CASING_PRESS 3
MCF_GAS 0
TUBING_PRESS 4
Perforation Data:
Interval Top:579 ft.# Of Holes:54
Interval Bottom:915 ft.Hole Size:0.4 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)4890
GOR
GOR DeterminationMCFE
Average BOE per Day2.309
Average MCFE per Day13.396

 Federal Financial Assurance  i 

 Tribal Well  i No