Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-08417
Well Classification: CBM Status: PR - 11/19/2018
Well Name/No:GOLDEN EAGLE #21-10
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date11/19/2018
FacilityID:278286LocationID:308665
County:LAS ANIMAS #071Location:NWSE 21 33S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:7264 ft.
Basin:RATON BASIN  
Planned Location:2196FSL  1481 FELLat/Long: 37.156432 / -104.888740Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.156690 / -104.888730Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 11/19/2018             Measured TD: 2035 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 11/19/2018
Wellbore Permit
Permit #:20051796 Expiration Date:6/15/2006
Proposed Depth/Form:1975 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:9/1/2005
Spud Date:6/19/2005Spud Date Is:ACTUAL
Measured TD:2035 ft.Measured PB depth:1964 ft.
True Vertical TD:True Vertical PB depth:
Log Types:AIL/TLD/CNL/TEMP/GR/CBL/CCL
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 203 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 112, Top: 0 ft., Bottom: 203 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2014 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 355, Top: 0 ft., Bottom: 2014 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1320 ft.NN
VERMEJO COAL1358 ft.1787 ft.NN
TRINIDAD1787 ft.2033 ft.NN

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 11/19/2018                Interval Top: 222 ft.    Interval Bottom: 1760 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:9/16/2005Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/26/2018Treatment End Date:8/31/2018
Treatment Summary:Perforate Raton Coal intervals with 3 SPF and 120 degree phasing listed by stage and fraced Raton Coal intervals including Stage 1 - 1260' - 62 and 1163' - 65', Stage 2 - 833' - 34', 795' - 96', 776' - 79', 727' - 29', 701' - 03' and 688' - 91', Stage 3 - 609' - 15', 541' - 43', 504' - 06' and 482' - 85', Stage 4 - 437' - 39', 428' - 29', 418' - 20', 390' - 94', 348' - 51' and 222' - 24' (41' net or 123 holes). A total of 206,682 gallons of produced water with 107,268 gallons of x-link and 152,666 lbs of 16/30 sand were pumped. All four stages were pumped according to design. The ECWS #28 rigged down and moved to next location. Well was cleaned out to PBTD and returned to production as a commingled Raton Vermejo well.
Total fluid used in treatment (bbls):7475Max pressure during treatment (psi):2894
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:4
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.27
Recycled water used in treatment (bbls):7475Total flowback volume recovered (bbls):0
Fresh water used in treatment (bbls):0Disposition method For flowback:
Total proppant used (lbs):152666Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:9/1/2005
Treatment Summary:ACIDIZED W/1500 GALS 15% HCI ACID. FRAC'D W/144,142 GALS 20# DELTA 140 W/SANDWEDGE NT CARRYING 218,440# 16/30 BRADY SD.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/4/2018Test Method:Pumping
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 46
BBLS_OIL 0
BTU_GAS 991
CALC_BBLS_H2O 46
CALC_MCF_GAS 8
CASING_PRESS 3
MCF_GAS 8
TUBING_PRESS 1
Perforation Data:
Interval Top:222 ft.# Of Holes:176
Interval Bottom:1760 ft.Hole Size:0.4 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)4324
GOR
GOR DeterminationMCFE
Average BOE per Day2.040
Average MCFE per Day11.840

 Federal Financial Assurance  i 

 Tribal Well  i No