Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-08368
Well Classification: CBM Status: PR - 7/28/2011
Well Name/No:HILL RANCH #16-1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/28/2011
FacilityID:277392LocationID:308631
County:LAS ANIMAS #071Location:NENE 16 35S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:8151 ft.
Basin:RATON BASIN  
Planned Location:544FNL  500 FELLat/Long: 37.003015 / -104.885779Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.003000 / -104.885810Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/16/2011
End Date: 6/16/2011
Reported: 4/17/2012
Prior to rule 205A.b.(2)(A)
Days to report: 306
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 7/28/2011             Measured TD: 2700 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 7/28/2011
Wellbore Permit
Permit #:20051181 Expiration Date:4/26/2006
Proposed Depth/Form:2610 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:6/5/2005
Spud Date:5/24/2005Spud Date Is:ACTUAL
Measured TD:2700 ft.Measured PB depth:2473 ft.
True Vertical TD:True Vertical PB depth:
Log Types:AIL/TLD/CNL/GR/TEMP/CBL/CCL
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 225 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 124, Top: 0 ft., Bottom: 225 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2611 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 731, Top: 0 ft., Bottom: 2611 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.2041 ft.NN
VERMEJO COAL2114 ft.2404 ft.NN
TRINIDAD2404 ft.2646 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 6/1/2011                  Interval Top: 2121 ft.    Interval Bottom: 2372 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:N/AChoke Size: 
Formation Name:VERMEJO COALCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/5/2005
Treatment Summary:A.W/1,000 GALS 15% HCL AC.FRAC'D W/116,819 GALS 20# DELTA 140 W/SW NT CARRYING 189,758# 16/30 BRADY SAND.
Tubing Size:2.875 in.Tubing Setting Depth:2464 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/1/2005Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 98
BBLS_OIL 0
BTU_GAS 1034
CALC_BBLS_H2O 98
CALC_MCF_GAS 126
CASING_PRESS 82
MCF_GAS 126
TUBING_PRESS 4
Perforation Data:
Interval Top:2121 ft.# Of Holes:34
Interval Bottom:2372 ft.Hole Size:0.4 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 7/28/2011                 Interval Top: 462 ft.    Interval Bottom: 2372 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:7/25/2011Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:2.375 in.Tubing Setting Depth:2458 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/28/2011Test Method:Pumping
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 50
BTU_GAS 1001
CALC_BBLS_H2O 50
CALC_MCF_GAS 17
CASING_PRESS 28
MCF_GAS 17
TUBING_PRESS 2
Perforation Data:
Interval Top:462 ft.# Of Holes:124
Interval Bottom:2372 ft.Hole Size:0.42 in.

Formation RTON                     Formation Classification:  GW                     Status:  CM - 8/15/2011                 Interval Top: 462 ft.    Interval Bottom: 1464 ft.

 Completed Information for Formation RATON COAL
1st Production Date:7/25/2011Choke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/17/2011
Treatment Summary:Acidized w/3,000 gals 15% HCl acid. Frac'd w/141,429 gals 20# Delta 140 w/Sandwedge OS carrying 383,028# 16/30 Brady sd.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:462 ft.# Of Holes:90
Interval Bottom:1464 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)18258
GOR
GOR DeterminationMCFE
Average BOE per Day8.631
Average MCFE per Day50.043

 Federal Financial Assurance  i 

 Tribal Well  i No