Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-08298
Well Classification: GW Status: PR - 8/15/2005
Well Name/No:APACHE CANYON #6-04
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/15/2005
FacilityID:275756LocationID:333483
County:LAS ANIMAS #071Location:NWNW 6 34S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:8146 ft.
Basin:RATON BASIN  
Planned Location:328FNL  722 FWLLat/Long: 37.119693 / -104.935221Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.119420 / -104.935540Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 8/15/2005             Measured TD: 2650 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 8/15/2005
Wellbore Permit
Permit #:20050089 Expiration Date:1/26/2006
Proposed Depth/Form:2600 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:STATE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:7/2/2005
Spud Date:2/28/2005Spud Date Is:ACTUAL
Measured TD:2650 ft.Measured PB depth:2390 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CBL, TLD/CNL, AIT, TEMP
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: , Depth: 425 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 304, Top: 0 ft., Bottom: 425 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: , Depth: 2606 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 320, Top: 780 ft., Bottom: 2606 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL
Cement:Sacks: 179, Top: 0 ft., Bottom: 770 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1908 ft.NN
VERMEJO COAL2026 ft.2382 ft.NN
TRINIDAD2382 ft.2641 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  AB - 11/10/2005                Interval Top: 2337 ft.    Interval Bottom: 2340 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:N/AChoke Size: 
Formation Name:VERMEJO COALCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/2/2005
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation VRMJ.
Perforation Data:
Interval Top:2337 ft.# Of Holes:
Interval Bottom:2340 ft.Hole Size:

Formation RTON                     Formation Classification:  GW                     Status:  PR - 8/15/2005                 Interval Top: 1110 ft.    Interval Bottom: 1332 ft.

 Completed Information for Formation RATON COAL
1st Production Date:8/13/2005Choke Size: 
Formation Name:RATON COALCommingled:No
Production Method:PUMPING
Open Hole Completion:No
Formation Treatment
Treatment Date:7/2/2005
Treatment Summary:A. W/1000 GALS 15% HCI ACID. FRAC'D W/135,067 20# LIGHTING GEL CARRYING 9080# 16/30 & 161,718# 12/20 ORLEBY NORTAN SAND.
Tubing Size:2.875 in.Tubing Setting Depth:1461 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/15/2005Test Method:PUMPING
Hours Tested:24Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 74
CALC_BBLS_H2O 74
CALC_MCF_GAS 29
CASING_PRESS 3
MCF_GAS 29
TUBING_PRESS 4
Perforation Data:
Interval Top:1110 ft.# Of Holes:40
Interval Bottom:1332 ft.Hole Size:0.4 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)13176
GOR
GOR DeterminationMCFE
Average BOE per Day6.202
Average MCFE per Day35.965

 Federal Financial Assurance  i 

 Tribal Well  i No