Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-08248
Well Classification: CBM Status: PR - 5/6/2020
Well Name/No:HILL RANCH #33-4X
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/6/2020
FacilityID:274677LocationID:312064
County:LAS ANIMAS #071Location:NWNW 33 34S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:8033 ft.
Planned Location:525FNL  794 FWLLat/Long: 37.046574 / -104.899449Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.046570 / -104.899450Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 5/6/2020             Measured TD: 2489 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 5/6/2020
Wellbore Permit
Permit #:20042750 Expiration Date:11/14/2005
Proposed Depth/Form:2600 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:1/31/2005
Spud Date:12/7/2004Spud Date Is:ACTUAL
Measured TD:2489 ft.Measured PB depth:2410 ft.
True Vertical TD:True Vertical PB depth:
Log Types:GR/CBL/CCL
Casing:String Type: SURF, Hole Size: 15 in., Size: 8.625 in., Top: , Depth: 566 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 247, Top: 0 ft., Bottom: 566 ft., Determination Method: CBL
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 2452 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 400, Top: 0 ft., Bottom: 2452 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1960 ft.NN
VERMEJO COAL2040 ft.2358 ft.NN
TRINIDAD2358 ft.2486 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 4/29/2020                 Interval Top: 2137 ft.    Interval Bottom: 2338 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:N/AChoke Size: 
Formation Name:VERMEJO COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/31/2005
Treatment Summary:ACIDIZED W/500 GALS 15% HC1 ACID. FRAC'D W/64,373 GALS 20# DELTA 140 W/SANDWEDGE NT CARRYING 22,700# 16/30 & 86,100# 12/20 SAND. ACIDIZED W/500 GALS 15% HC1 ACID. FRAC'D W/47,300 GALS 20# DELTA 140 W/SANDWEDGE NT CARRYING 1474# 16/30 & 61,300# 12/20 SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 40
BBLS_OIL 0
CASING_PRESS 4
MCF_GAS 0
TUBING_PRESS 0
Perforation Data:
Interval Top:2137 ft.# Of Holes:24
Interval Bottom:2338 ft.Hole Size:0.4 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 5/6/2020                  Interval Top: 606 ft.    Interval Bottom: 2338 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:9/14/2018Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RT-VJ.
Perforation Data:
Interval Top:606 ft.# Of Holes:132
Interval Bottom:2338 ft.Hole Size:0.4 in.

Formation RTON                     Formation Classification:  GW                     Status:  CM - 9/14/2018                 Interval Top: 606 ft.    Interval Bottom: 1392 ft.

 Completed Information for Formation RATON COAL
1st Production Date:N/AChoke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/4/2018Treatment End Date:9/13/2018
Treatment Summary:Perforate Raton Coal intervals with 3 SPF and 120 degree phasing listed by stage and fraced Raton Coal intervals including Stage 1 - 1389' - 92' and 1354' - 57', Stage 2 - 1288' - 91', 1282' - 83', 1238' - 42' and 1216' - 19', Stage 3 - 1117' - 20', 1113' - 15; and 1066' - 67', Stage 4 - 904' - 06', 880' - 82', 865' - 68' and 852' - 54', Stage 5 - 656' - 59' and 606' - 607' (36' net or 108 holes). A total of 159,600 gallons of produced water with 88,578 gallons of x-link and 80,692 lbs of 16/30 sand were pumped. All five stages were pumped according to design. The ECWS #28 rigged down and moved to next location. Well was cleaned out to PBTD and returned to production as a commingled Raton Vermejo well.
Total fluid used in treatment (bbls):5909Max pressure during treatment (psi):3399
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:5
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.38
Recycled water used in treatment (bbls):5909Total flowback volume recovered (bbls):0
Fresh water used in treatment (bbls):0Disposition method For flowback:
Total proppant used (lbs):80692Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/14/2018Test Method:Flowing
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 27
BTU_GAS 996
CALC_BBLS_H2O 27
CALC_MCF_GAS 23
MCF_GAS 23
Perforation Data:
Interval Top:606 ft.# Of Holes:108
Interval Bottom:1392 ft.Hole Size:0.4 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)23225
GOR
GOR DeterminationMCFE
Average BOE per Day10.956
Average MCFE per Day63.549

 Federal Financial Assurance  i 

 Tribal Well  i No