|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 3/5/2007 Measured TD: 2650 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 3/5/2007 | | Wellbore Permit | | | Permit #: | | Expiration Date: | 5/20/2005 | | Proposed Depth/Form: | 2800 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 9/15/2004 | | Spud Date: | 6/13/2004 | Spud Date Is: | ACTUAL | | Measured TD: | 2650 ft. | Measured PB depth: | 2620 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | AIL , TLD / CSN / DTL , GR / CBL, TEMPERATURE | | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 344 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 180, Top: 0 ft., Bottom: 344 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2620 ft., Weight: 17 , Citings Type: ACTUAL | | Cement: | Sacks: 422, Top: 56 ft., Bottom: 2620 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | RATON COAL | 0 ft. | 2085 ft. | N | N | | VERMEJO COAL | 2160 ft. | 2445 ft. | N | N | | TRINIDAD | 2445 ft. | 2645 ft. | N | N |
Formation VRMJ Formation Classification: GW Status: CM - 3/5/2007 Interval Top: 2161 ft. Interval Bottom: 2383 ft.| Completed Information for Formation VERMEJO COAL | | 1st Production Date: | 9/15/2004 | Choke Size: | | | Formation Name: | VERMEJO COAL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/12/2010 | | Treatment Summary: | ACIDIZED WITH 2000 GALS 15% HCI ACID. REFRACD WITH 135311 GALS 20# DELTA 140 WITH SANDWEDGE OS CARRYING 16627# 16/30 BRADY SD & 232188# 12/20 BRADY SD. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 110 | | CALC_BBLS_H2O | 110 | | CALC_MCF_GAS | 38 | | CASING_PRESS | 56 | | MCF_GAS | 38 | | TUBING_PRESS | 4 |
| | Perforation Data: | | Interval Top: | 2161 ft. | # Of Holes: | 52 | | Interval Bottom: | 2383 ft. | Hole Size: | 0.4 in. |
|
Formation RT-VJ Formation Classification: GW Status: PR - 1/26/2010 Interval Top: 496 ft. Interval Bottom: 2383 ft.| Completed Information for Formation RATON-VERMEJO COALS | | 1st Production Date: | 1/23/2010 | Choke Size: | | | Formation Name: | RATON-VERMEJO COALS | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/15/2004 | | Treatment Summary: | |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 2488 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/26/2010 | Test Method: | PUMPING | | Hours Tested: | 24 | Gas Type: | COAL GAS | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 128 | | BTU_GAS | 999 | | CALC_BBLS_H2O | 128 | | CALC_MCF_GAS | 9 | | CASING_PRESS | 95 | | MCF_GAS | 9 | | TUBING_PRESS | 3 |
| | Perforation Data: | | Interval Top: | 496 ft. | # Of Holes: | 130 | | Interval Bottom: | 2383 ft. | Hole Size: | 0.45 in. |
|
Formation RTON Formation Classification: GW Status: CM - 3/5/2007 Interval Top: 496 ft. Interval Bottom: 1452 ft.| Completed Information for Formation RATON COAL | | 1st Production Date: | 1/23/2010 | Choke Size: | | | Formation Name: | RATON COAL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/15/2010 | | Treatment Summary: | ACIDIZED WITH 3000 GALS 15% HCI ACID. FRACD WITH 163999 GALS 20# DELTA 140 WITH SANDWEDGE OS CARRYING 17833# 16/30 BRADY SD & 256152# 12/20 BRADY SD. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation RTON. |
| | Perforation Data: | | Interval Top: | 496 ft. | # Of Holes: | 78 | | Interval Bottom: | 1452 ft. | Hole Size: | 0.45 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 28576 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 13.501 |
| Average MCFE per Day | 78.289 |
| Federal Financial Assurance | i | |
|
|