Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-08052
Well Classification: CBM Status: PR - 5/6/2020
Well Name/No:GOLDEN EAGLE #20-07
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/6/2020
FacilityID:272123LocationID:308442
County:LAS ANIMAS #071Location:SWNE 20 33S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:7565 ft.
Basin:RATON BASIN  
Planned Location:1410FNL  1314 FELLat/Long: 37.161182 / -104.906580Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.161324 / -104.906271Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 5/6/2020             Measured TD: 2400 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 5/6/2020
Wellbore Permit
Permit #:20040885 Expiration Date:4/29/2005
Proposed Depth/Form:2800 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:10/29/2004
Spud Date:5/19/2004Spud Date Is:ACTUAL
Measured TD:2400 ft.Measured PB depth:2346 ft.
True Vertical TD:True Vertical PB depth:
Log Types:AIL/TLD/CSN & GR/CBL
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: , Depth: 557 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 250, Top: 0 ft., Bottom: 557 ft., Determination Method: CBL
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 2380 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 364, Top: 0 ft., Bottom: 2380 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1600 ft.NN
VERMEJO COAL1672 ft.2097 ft.NN
TRINIDAD2097 ft.2391 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 4/29/2020                 Interval Top: 1748 ft.    Interval Bottom: 2076 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:N/AChoke Size: 
Formation Name:VERMEJO COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/29/2004
Treatment Summary:SEE SCANNED DOC #01260032
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 204
BBLS_OIL 0
CALC_BBLS_H2O 204
CASING_PRESS 5
MCF_GAS 0
TUBING_PRESS 44
Perforation Data:
Interval Top:1748 ft.# Of Holes:58
Interval Bottom:2076 ft.Hole Size:0.4 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 5/6/2020                  Interval Top: 626 ft.    Interval Bottom: 2076 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:10/8/2018Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RT-VJ.
Perforation Data:
Interval Top:626 ft.# Of Holes:148
Interval Bottom:2076 ft.Hole Size:0.4 in.

Formation RTON                     Formation Classification:  GW                     Status:  CM - 10/22/2018                Interval Top: 626 ft.    Interval Bottom: 965 ft.

 Completed Information for Formation RATON COAL
1st Production Date:N/AChoke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/14/2018Treatment End Date:10/7/2018
Treatment Summary:Perforate Raton Coal intervals with 3 SPF and 120 degree phasing listed by stage and fraced Raton Coal intervals including Stage 1 - 962' - 65', 892' - 94' and 875' - 83', Stage 2 - 848' - 51', 809' - 14', 772' - 73' and 765' - 68', Stage 3 - 650' - 53' and 626' - 28' (30' net or 90 holes). A total of 76,440 gallons of produced water with 66,990 gallons of x-link and 99,140 lbs of 16/30 sand were pumped. All three stages were pumped according to design. The ECWS #28 rigged down and moved to next location. Well was cleaned out to PBTD and returned to production as a commingled Raton Vermejo well.
Total fluid used in treatment (bbls):3415Max pressure during treatment (psi):2383
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:3
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.57
Recycled water used in treatment (bbls):3415Total flowback volume recovered (bbls):0
Fresh water used in treatment (bbls):0Disposition method For flowback:
Total proppant used (lbs):99140Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/22/2018Test Method:Flowing
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 35
BTU_GAS 996
CALC_BBLS_H2O 35
CALC_MCF_GAS 81
CASING_PRESS 11
MCF_GAS 81
Perforation Data:
Interval Top:626 ft.# Of Holes:90
Interval Bottom:965 ft.Hole Size:0.4 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)6563
GOR
GOR DeterminationMCFE
Average BOE per Day3.101
Average MCFE per Day17.978

 Federal Financial Assurance  i 

 Tribal Well  i No