|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 9/24/2004 Measured TD: 2335 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 9/24/2004 | | Wellbore Permit | | | Permit #: | 20040200 | Expiration Date: | 2/18/2005 | | Proposed Depth/Form: | 2400 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 6/26/2004 | | Spud Date: | 3/13/2004 | Spud Date Is: | ACTUAL | | Measured TD: | 2335 ft. | Measured PB depth: | 2282 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | AIL , TLD / CSN & GR / CBL, CALIPER-CEMENT VOLUME | | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 788 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 330, Top: 0 ft., Bottom: 766 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2318 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 364, Top: 45 ft., Bottom: 2318 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | RATON COAL | 0 ft. | 1619 ft. | N | N | | VERMEJO COAL | 1712 ft. | 2114 ft. | N | N | | TRINIDAD | 2114 ft. | 2336 ft. | N | N |
Formation VRMJ Formation Classification: GW Status: PR - 9/24/2004 Interval Top: 1782 ft. Interval Bottom: 2083 ft.| Completed Information for Formation VERMEJO COAL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | VERMEJO COAL | Commingled: | No | | Production Method: | PUMPING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/26/2004 | | Treatment Summary: | ACIDIZED W/900 GALS 15% HCL ACID. FRAC'D W/100,696 GALS 20# DELTA 140 W/SANDWDEGE NT CARRYING 9,000 # 20/40 & 91,900# 12/20 BRADY SAND. |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 2189 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/28/2004 | Test Method: | PUMPING | | Hours Tested: | 24 | Gas Type: | COAL GAS | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 112 | | CALC_BBLS_H2O | 112 | | CALC_MCF_GAS | 4 | | CASING_PRESS | 20 | | MCF_GAS | 4 | | TUBING_PRESS | 4 |
| | Perforation Data: | | Interval Top: | 1782 ft. | # Of Holes: | 60 | | Interval Bottom: | 2083 ft. | Hole Size: | 0.4 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 12131 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 5.735 |
| Average MCFE per Day | 33.237 |
| Federal Financial Assurance | i | |
|
|