|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 1/20/2004 Measured TD: 2600 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 1/20/2004 | | Wellbore Permit | | | Permit #: | 20040198 | Expiration Date: | 2/17/2005 | | Proposed Depth/Form: | 2626 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | STATE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 7/28/2004 | | Spud Date: | 3/24/2004 | Spud Date Is: | ACTUAL | | Measured TD: | 2600 ft. | Measured PB depth: | 2572 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | EPETHERMAN NEUTRON-LITHO DENSITY, INDUCTION W/LINEAR EST, CEMENT BOND (1), CALIPER LOG, CALIPER LOG | | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 975 ft., Weight: 20 , Citings Type: ACTUAL | | Cement: | Sacks: 395, Top: 0 ft., Bottom: 975 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2544 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 400, Top: 30 ft., Bottom: 2544 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | RATON COAL | 0 ft. | | N | N | | VERMEJO COAL | 2054 ft. | 2366 ft. | N | N | | TRINIDAD | 2366 ft. | 2580 ft. | N | N |
Formation VRMJ Formation Classification: GW Status: PR - 8/3/2004 Interval Top: 2115 ft. Interval Bottom: 2341 ft.| Completed Information for Formation VERMEJO COAL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | VERMEJO COAL | Commingled: | No | | Production Method: | 30N095 PC PUMP | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/28/2004 | | Treatment Summary: | SEE SCANNED DOC#1527164 |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 2423 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/3/2004 | Test Method: | FLOW | | Hours Tested: | 15 | Gas Type: | COAL GAS | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 55 | | CASING_PRESS | 5 | | MCF_GAS | 0 | | TUBING_PRESS | 0 |
| | Perforation Data: | | Interval Top: | 2115 ft. | # Of Holes: | 56 | | Interval Bottom: | 2341 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 20474 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 9.671 |
| Average MCFE per Day | 56.095 |
| Federal Financial Assurance | i | |
|
|