|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 8/13/2010 Measured TD: 2455 ft. Vertical TD: 2455 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 8/13/2010 | | Wellbore Permit | | | Permit #: | 20031655 | Expiration Date: | 9/23/2004 | | Proposed Depth/Form: | 2050 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 12/29/2003 | | Spud Date: | 11/18/2003 | Spud Date Is: | ACTUAL | | Measured TD: | 2455 ft. | Measured PB depth: | 2410 ft. | | True Vertical TD: | 2455 ft. | True Vertical PB depth: | 2410 ft. | | Log Types: | ARRAY INDUCTION, EPITHERMAL NEUTRON LITHO DENSITY, CEMENT BOND LOG, AFTER FRAC, AND MUD LOG | | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 260 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 85, Top: 0 ft., Bottom: 260 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2419 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 374, Top: 0 ft., Bottom: 2402 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | RATON COAL | 0 ft. | 1940 ft. | N | N | | VERMEJO COAL | 1940 ft. | 2198 ft. | N | N | | TRINIDAD | 2218 ft. | | N | N |
Formation VRMJ Formation Classification: GW Status: PR - 8/13/2010 Interval Top: 1948 ft. Interval Bottom: 2192 ft.| Completed Information for Formation VERMEJO COAL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | VERMEJO COAL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/29/2003 | | Treatment Summary: | PUMPED FRACTURE TREATMENT W/ 14,510# OF 20/40 OTTAWA/TLC SAND AT 18.2 BPM, AVG PRESSURE AT 2100 PSI (STAGE 1 - STAGE 3) THRU 46 HOLES; 1948-1954', 1961-1963', 2032-2034', 2115-2117', 2178-2182', 2190-2192' |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation VRMJ. |
| | Perforation Data: | | Interval Top: | 1948 ft. | # Of Holes: | 46 | | Interval Bottom: | 2192 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 7980 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 3.770 |
| Average MCFE per Day | 21.867 |
| Federal Financial Assurance | i | |
|
|