Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07901
Well Classification: CBM Status: PR - 8/9/2011
Well Name/No:APACHE CANYON #1-5
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/9/2011
FacilityID:269064LocationID:308363
County:LAS ANIMAS #071Location:SWNW 1 34S68W 6
Field:PURGATOIRE RIVER - #70830Elevation:8519 ft.
Basin:RATON BASIN  
Planned Location:1889FNL  866 FWLLat/Long: 37.115243 / -104.952851Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.115240 / -104.952810Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/14/2011
End Date: 7/14/2011
Reported: 4/16/2012
Prior to rule 205A.b.(2)(A)
Days to report: 277
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 8/9/2011             Measured TD: 2610 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 8/9/2011
Wellbore Permit
Permit #:20031372 Expiration Date:8/11/2004
Proposed Depth/Form:2800 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:STATE
Unit: Unit Number: 
Formation And Spacing:Code: RT-VJ , Formation: RATON-VERMEJO COALS , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:9/3/2003
Spud Date:8/16/2003Spud Date Is:ACTUAL
Measured TD:2610 ft.Measured PB depth:2570 ft.
True Vertical TD:True Vertical PB depth:
Log Types:EPITHERMAL NEUTRON LITHO DENSITY, ARRAY INDUCTION, CEMENT BOND (2)
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: , Depth: 808 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 300, Top: , Bottom: 808 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 2.5 in., Top: , Depth: 2577 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 718, Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1906 ft.NN
RATON SAND1906 ft.2020 ft.NN
VERMEJO COAL2020 ft.2368 ft.NN
TRINIDAD2668 ft.2588 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 6/6/2014                  Interval Top: 2026 ft.    Interval Bottom: 2309 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:N/AChoke Size: 
Formation Name:VERMEJO COALCommingled:No
Production Method:30N095 PC PUMP
Open Hole Completion:No
Formation Treatment
Treatment Date:9/3/2003
Treatment Summary:PERF 2221-2309(3 SPF-24 HOLES).FRAC 1STG: 750 GALS 15% HCL 7350 GALS GEL 40748 GALS DELTA 20# 9343 20/40&56167#16/20 BRADY SAND.PERF 2026-2152 (3 SPF - 30 HOLES) FRAC 2STG:750GALS15% HCL 6860GALS GEL 43073GALS DELTA 20# 9306 20/40 &62247#16/20 BRADY SAND
Tubing Size:2.875 in.Tubing Setting Depth:2336 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/15/2003Test Method:TOTAL FLOW EFM
Hours Tested:Gas Type:COAL GAS
Gas Disposal:
Test TypeMeasure
BBLS_H2O 87
CALC_BBLS_H2O 87
MCF_GAS 0
Perforation Data:
Interval Top:2026 ft.# Of Holes:54
Interval Bottom:2309 ft.Hole Size:0.51 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 8/9/2011                  Interval Top: 839 ft.    Interval Bottom: 2309 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:8/8/2011Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:2.875 in.Tubing Setting Depth:2407 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/9/2011Test Method:Pumping
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 16
BTU_GAS 1007
CALC_BBLS_H2O 16
CALC_MCF_GAS 68
CASING_PRESS 1
MCF_GAS 68
TUBING_PRESS 3
Perforation Data:
Interval Top:839 ft.# Of Holes:117
Interval Bottom:2309 ft.Hole Size:0.42 in.

Formation RTON                     Formation Classification:  GW                     Status:  CM - 8/26/2011                 Interval Top: 839 ft.    Interval Bottom: 1308 ft.

 Completed Information for Formation RATON COAL
1st Production Date:8/8/2011Choke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/14/2011
Treatment Summary:Acidized w/2,000 gals 15% HCl acid. Frac'd w/83,279 gals 20# Delta 140 w/Sandwedge OS carrying 253,500# 16/30 Nebraska sd.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:839 ft.# Of Holes:63
Interval Bottom:1308 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)20813
GOR
GOR DeterminationMCFE
Average BOE per Day9.832
Average MCFE per Day57.031

 Federal Financial Assurance  i 

 Tribal Well  i No