Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07818
Well Classification: CBM Status: PR - 8/31/2009
Well Name/No:HILL RANCH #08-10
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:26926
Facility Status:PRStatus Date8/31/2009
FacilityID:266153LocationID:308318
County:LAS ANIMAS #071Location:NWSE 8 35S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:8207 ft.
Basin:RATON BASIN  
Planned Location:2365FSL  2407 FELLat/Long: 37.011025 / -104.910389Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.011030 / -104.910410Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 8/31/2009             Measured TD: 2547 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 8/31/2009
Wellbore Permit
Permit #:20030162 Expiration Date:2/11/2004
Proposed Depth/Form:2800 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:9/1/2003
Spud Date:6/27/2003Spud Date Is:ACTUAL
Measured TD:2547 ft.Measured PB depth:2419 ft.
True Vertical TD:True Vertical PB depth:
Log Types:EPITHERMAL NEU.,LITH DEN.,ARRAY IND.,CEMENT BOND
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 286 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 124, Top: 0 ft., Bottom: 286 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2537 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 500, Top: 0 ft., Bottom: 2537 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.2054 ft.NN
VERMEJO COAL2138 ft.2440 ft.NN
TRINIDAD2440 ft.2547 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 12/14/2010                Interval Top: 2203 ft.    Interval Bottom: 2373 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:9/12/2003Choke Size: 
Formation Name:VERMEJO COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/12/2009
Treatment Summary:ACIDIZED W/ 3,800 GALS 15% HCI ACID. REFRAC'D W/ 70,289 GALS 20# DELTA 140 W/SANDWEDGE OS CARRYING 107,507# 20/40 BRADY SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 147
BTU_GAS 1004
CALC_BBLS_H2O 147
CALC_MCF_GAS 28
CASING_PRESS 25
MCF_GAS 28
Perforation Data:
Interval Top:2203 ft.# Of Holes:
Interval Bottom:2373 ft.Hole Size:

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 8/31/2009                 Interval Top: 500 ft.    Interval Bottom: 2373 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:8/30/2009Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/1/2003
Treatment Summary:
Tubing Size:2.875 in.Tubing Setting Depth:2402 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/31/2009Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 42
BTU_GAS 1005
CALC_BBLS_H2O 42
CALC_BBLS_OIL 0
CALC_MCF_GAS 27
CASING_PRESS 98
MCF_GAS 27
TUBING_PRESS 7
Perforation Data:
Interval Top:500 ft.# Of Holes:
Interval Bottom:2373 ft.Hole Size:

Formation RTON                     Formation Classification:  GW                     Status:  CM - 5/13/2010                 Interval Top: 500 ft.    Interval Bottom: 1434 ft.

 Completed Information for Formation RATON COAL
1st Production Date:8/30/2009Choke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/12/2009
Treatment Summary:ACIDIZED W/ 4,000 GALS 15% HCI ACID. FRAC'D W/ 165,222 GALS 20# DELTA 140 W/ SANDWEDGE OS CARRYING 30,427# 16/30 BRADY SAND, & 306,891# 12/20 BRADY SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:500 ft.# Of Holes:80
Interval Bottom:1434 ft.Hole Size:0.45 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)27909
GOR
GOR DeterminationMCFE
Average BOE per Day13.196
Average MCFE per Day76.534

 Federal Financial Assurance  i 

 Tribal Well  i No