Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07817
Well Classification: CBM Status: PR - 5/6/2020
Well Name/No:HILL RANCH #34-08
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/6/2020
FacilityID:266154LocationID:308317
County:LAS ANIMAS #071Location:SENE 34 34S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:7915 ft.
Basin:RATON BASIN  
Planned Location:2432FNL  186 FELLat/Long: 37.041304 / -104.866628Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.041310 / -104.866630Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 5/6/2020             Measured TD: 2415 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 5/6/2020
Wellbore Permit
Permit #:20030167 Expiration Date:2/11/2004
Proposed Depth/Form:2800 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: , Depth: 325 ft., Weight: 23 , Citings Type: PLANNED
Cement:Sacks: , Top: 0 ft., Bottom: 325 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 2800 ft., Weight: 15.5 , Citings Type: PLANNED
Cement:Sacks: , Top: 0 ft., Bottom: 2800 ft.

Wellbore Completed
Completion Date:9/19/2003
Spud Date:8/19/2003Spud Date Is:ACTUAL
Measured TD:2415 ft.Measured PB depth:2396 ft.
True Vertical TD:True Vertical PB depth:
Log Types:
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1833 ft.NN
VERMEJO COAL1941 ft.2248 ft.NN
TRINIDAD2248 ft.2414 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 4/29/2020                 Interval Top: 1979 ft.    Interval Bottom: 2226 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:9/25/2003Choke Size: 
Formation Name:VERMEJO COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/5/2006
Treatment Summary:ACIDIZED W/1000 GALS 15% HCI ACID. FRAC'D W/110,099 GALS DELTA 140 W/SANDWEDGE NT CARRYING 169,600# 16/30 BRADY SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 51
BTU_GAS 1006
CALC_BBLS_H2O 51
CALC_MCF_GAS 21
CASING_PRESS 47
GRAVITY_OIL 1
MCF_GAS 21
TUBING_PRESS 3
Perforation Data:
Interval Top:1979 ft.# Of Holes:27
Interval Bottom:2226 ft.Hole Size:0.4 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 5/6/2020                  Interval Top: 371 ft.    Interval Bottom: 2226 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:10/4/2018Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RT-VJ.
Perforation Data:
Interval Top:371 ft.# Of Holes:135
Interval Bottom:2226 ft.Hole Size:0.4 in.

Formation RTON                     Formation Classification:  GW                     Status:  CM - 10/12/2018                Interval Top: 371 ft.    Interval Bottom: 1672 ft.

 Completed Information for Formation RATON COAL
1st Production Date:N/AChoke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/26/2018Treatment End Date:10/3/2018
Treatment Summary:Perforate Raton Coal intervals with 3 SPF and 120 degree phasing listed by stage and fraced Raton Coal intervals including Stage 1 - 1670' - 72', 1478' - 80' and 1322' - 23', Stage 2 - 1209' - 10', 1190' - 92' and 1139' - 41', Stage 3 - 1128' - 31', 1035' - 38' and 1000' - 01', Stage 4 - 934' - 36', 844' - 45', 832' - 34', 823' - 26', 729' - 31' and 707' - 09', Stage 5 - 606' - 08', 452' - 53', 403' - 05' and 371' - 73' (36' net or 108 holes). A total of 176,400 gallons of produced water with 113,022 gallons of x-link and 150,555 lbs of 20/40 sand were pumped. All five stages were pumped according to design. The ECWS #28 rigged down and moved to next location. Well was cleaned out to PBTD and returned to production as a commingled Raton Vermejo well.
Total fluid used in treatment (bbls):6891Max pressure during treatment (psi):3477
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:5
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.42
Recycled water used in treatment (bbls):6891Total flowback volume recovered (bbls):0
Fresh water used in treatment (bbls):0Disposition method For flowback:
Total proppant used (lbs):150555Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/12/2018Test Method:Flowing
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1
BTU_GAS 993
CALC_BBLS_H2O 1
CALC_MCF_GAS 8
MCF_GAS 8
Perforation Data:
Interval Top:371 ft.# Of Holes:108
Interval Bottom:1672 ft.Hole Size:0.4 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)21970
GOR
GOR DeterminationMCFE
Average BOE per Day10.380
Average MCFE per Day60.187

 Federal Financial Assurance  i 

 Tribal Well  i No