Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07812
Well Classification: CBM Status: PR - 7/15/2011
Well Name/No:HILL RANCH #33-09
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:270817
Facility Status:PRStatus Date7/15/2011
FacilityID:266140LocationID:308314
County:LAS ANIMAS #071Location:NESE 33 34S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:7902 ft.
Planned Location:2538FSL  1250 FELLat/Long: 37.040474 / -104.888359Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.040480 / -104.888350Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/23/2011
End Date: 6/23/2011
Reported: 4/17/2012
Prior to rule 205A.b.(2)(A)
Days to report: 299
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 7/15/2011             Measured TD: 2390 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 7/15/2011
Wellbore Permit
Permit #:20030166 Expiration Date:2/11/2004
Proposed Depth/Form:2390 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:11/9/2003
Spud Date:8/24/2003Spud Date Is:ACTUAL
Measured TD:2390 ft.Measured PB depth:2370 ft.
True Vertical TD:True Vertical PB depth:
Log Types:EPITHERMAL NEUTRON LITHO DENSITY, ARRAY INDUCTION, CEMENT BOND
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 430 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 220, Top: 0 ft., Bottom: 430 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2366 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 360, Top: 90 ft., Bottom: 2366 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1915 ft.NN
VERMEJO COAL1915 ft.2221 ft.NN
TRINIDAD2221 ft.2378 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 9/18/2003                 Interval Top: 1916 ft.    Interval Bottom: 2196 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:N/AChoke Size: 
Formation Name:VERMEJO COALCommingled:No
Production Method:PC PUMP
Open Hole Completion:No
Formation Treatment
Treatment Date:11/9/2003
Treatment Summary:SEE OGCC COMMENTS
Tubing Size:2.875 in.Tubing Setting Depth:2216 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/18/2003Test Method:ORIFICE METER
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 100
BBLS_OIL 0
BTU_GAS 1000
CALC_BBLS_H2O 100
CALC_MCF_GAS 147
CASING_PRESS 25
MCF_GAS 147
Perforation Data:
Interval Top:1916 ft.# Of Holes:75
Interval Bottom:2196 ft.Hole Size:

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 7/15/2011                 Interval Top: 644 ft.    Interval Bottom: 2196 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:7/14/2011Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:2.875 in.Tubing Setting Depth:2249 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/15/2011Test Method:Pumping
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 110
BTU_GAS 1007
CALC_BBLS_H2O 110
CALC_MCF_GAS 78
CASING_PRESS 46
MCF_GAS 78
TUBING_PRESS 2
Perforation Data:
Interval Top:644 ft.# Of Holes:162
Interval Bottom:2196 ft.Hole Size:0.42 in.

Formation RTON                     Formation Classification:  GW                     Status:  CM - 8/15/2011                 Interval Top: 644 ft.    Interval Bottom: 1270 ft.

 Completed Information for Formation RATON COAL
1st Production Date:7/14/2011Choke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/23/2011
Treatment Summary:Acidized w/2,750 gals 15% HCl acid. Frac'd w/86,184 gals 20# Delta 140 w/Sandwedge OS carrying 292,052# 16/30 Nebraska sd.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:644 ft.# Of Holes:87
Interval Bottom:1270 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)45066
GOR
GOR DeterminationMCFE
Average BOE per Day21.278
Average MCFE per Day123.426

 Federal Financial Assurance  i 

 Tribal Well  i No