Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07811
Well Classification: CBM Status: PR - 10/23/2013
Well Name/No:HILL RANCH #28-15
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/23/2013
FacilityID:266142LocationID:308313
County:LAS ANIMAS #071Location:SWSE 28 34S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:8041 ft.
Planned Location:366FSL  2567 FWLLat/Long: 37.049014 / -104.892879Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.049010 / -104.892860Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 10/23/2013             Measured TD: 2540 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 10/23/2013
Wellbore Permit
Permit #:20030164 Expiration Date:2/11/2004
Proposed Depth/Form:2800 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:9/26/2003
Spud Date:8/21/2003Spud Date Is:ACTUAL
Measured TD:2540 ft.Measured PB depth:2463 ft.
True Vertical TD:True Vertical PB depth:
Log Types:EPITHERMAL NEUT. LITHO DENSITY, ARRAY INDUCTION, CEMENT BOND
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 566 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 255, Top: 0 ft., Bottom: 566 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2490 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 365, Top: 92 ft., Bottom: 2490 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.2082 ft.NN
VERMEJO COAL2082 ft.2376 ft.NN
TRINIDAD2376 ft.2530 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 10/22/2013                Interval Top: 2083 ft.    Interval Bottom: 2353 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:N/AChoke Size: 
Formation Name:VERMEJO COALCommingled:
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/17/2005
Treatment Summary:2005 Status Changed missed filing on original Doc #01421536
Formation Treatment
Treatment Date:9/26/2003
Treatment Summary:SEE SCANNED DOC# 1159443
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 100
BTU_GAS 1000
CALC_BBLS_H2O 100
CALC_MCF_GAS 0
MCF_GAS 0
Perforation Data:
Interval Top:2083 ft.# Of Holes:63
Interval Bottom:2353 ft.Hole Size:

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 10/23/2013                Interval Top: 885 ft.    Interval Bottom: 2353 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:8/17/2005Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:10/23/2013Treatment End Date:N/A
Treatment Summary:08/12/2005 Drilled out CIBP set @ 1680.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.875 in.Tubing Setting Depth:2378 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RT-VJ.
Perforation Data:
Interval Top:885 ft.# Of Holes:171
Interval Bottom:2353 ft.Hole Size:

Formation RTON                     Formation Classification:  GW                     Status:  CM - 10/22/2013                Interval Top: 885 ft.    Interval Bottom: 1486 ft.

 Completed Information for Formation RATON COAL
1st Production Date:5/25/2005Choke Size: 
Formation Name:RATON COALCommingled:
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/17/2005
Treatment Summary:A. w/2500 gals 15% HCl acid. Frac'd w/242,116 gals 20# Delta 140 w/sandwedge NT carrying 35,342# 16/30 & 358,033# 12/20 Brady sands.
Formation Treatment
Treatment Date:9/26/2003
Treatment Summary:ACIDIZED W/2500 GALS 15% HCL ACID.FRAC'D W/242,116 GALS 20# DELTA 140 W/SANDWEDGE NT CARRYING 35,342# 16/30 & 358,033# 12/20 BRADY SD.
Tubing Size:2.875 in.Tubing Setting Depth:1581 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/25/2005Test Method:Pumping
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 200
BTU_GAS 1005
CALC_BBLS_H2O 200
CALC_MCF_GAS 20
CASING_PRESS 28
GRAVITY_OIL 1
MCF_GAS 20
Perforation Data:
Interval Top:885 ft.# Of Holes:108
Interval Bottom:1486 ft.Hole Size:0.4 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)54212
GOR
GOR DeterminationMCFE
Average BOE per Day25.609
Average MCFE per Day148.499

 Federal Financial Assurance  i 

 Tribal Well  i No