Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07796
Well Classification: CBM Status: PR - 4/30/2014
Well Name/No:VPR C #117
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:WAPITI OPERATING LLC - 10351
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/30/2014
FacilityID:265684LocationID:308307
County:LAS ANIMAS #071Location:NENW 18 35S65W 6
Field:PURGATOIRE RIVER - #70830Elevation:7432 ft.
Basin:RATON BASIN  
Planned Location:820FNL  1340 FWLLat/Long: 37.002676 / -104.717044Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.002660 / -104.717050Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 4/30/2014             Measured TD: 1880 ft.    Vertical TD: 1880 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 4/30/2014
Wellbore Permit
Permit #:20022306 Expiration Date:1/1/2004
Proposed Depth/Form:2000 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:10/23/2003
Spud Date:5/10/2003Spud Date Is:ACTUAL
Measured TD:1880 ft.Measured PB depth:1845 ft.
True Vertical TD:1880 ft.True Vertical PB depth:1845 ft.
Log Types:ARRAY INDUCTION, EPITHERMAL NEUTRON LITHO DENSITY, CEMENT BOND LOG. AFTER FRAC & MUD LOG.
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 259 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 85, Top: 0 ft., Bottom: 260 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 1866 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 255, Top: 30 ft., Bottom: 1855 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1386 ft.NN
VERMEJO COAL1396 ft.1616 ft.NN
TRINIDAD1618 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 10/12/2010                Interval Top: 1513 ft.    Interval Bottom: 1616 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:N/AChoke Size: 
Formation Name:VERMEJO COALCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:9/17/2010
Treatment Summary:PERF'D 1513-1519', 1526-1529,1582-1588', 1590-1592' & 1610'-1616' 9/16/10 1610'-1616' 300 GAL OF ACID 7.5% HCL, 1582'-1588' & 1590'-1592' 300 GAL 7.5% HCL 1526-1529 300 GAL OF ACID 7.5% HCL. 1513-1519 300 GAL OF ACID 7.5% HCL, 9/17/10 1526-1529 50 GAL OF ACID 15% HCL, * 15 PREVIOUS HOLES PLUS 92 HOLES THIS PERF = 107 HOLES.
Formation Treatment
Treatment Date:10/23/2003
Treatment Summary:10/21/03 PUMPED FRACTURE TREATMENT W/62,400 LBS OF 20/40 OTTAWA/TLC SAND AT 10.8 BPM. AVG PRESSURE AT 2,517 PSI. (STAGE 1 THRU 3) THRU 15 HOLES, 1611-1614',1582-1586',1517-1519',1526-1528'.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation VRMJ.
Perforation Data:
Interval Top:1513 ft.# Of Holes:107
Interval Bottom:1616 ft.Hole Size:

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 10/12/2010                Interval Top: 1252 ft.    Interval Bottom: 1307 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:N/AChoke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:9/17/2010
Treatment Summary:PERF'D 1252-1255 & 1304-1307, 1513-1519, 1526-1529, 1582-1588',1590'-1592' & 1610'-1616' 09/16/10 1610'-1616' 300 GAL OF ACID 7.5% HCL, 1582'-1588' & 1590-1592 300 GAL ACID 7.5% HCL 1526-1529 300 GALL OF ACID 7.5% HCL 1513-1519 300 GAL OF ACID 7.5% HCL 9/17/10 1526-1529 50 GAL OF ACID 15% HCL 1252-1255 150 AK IF ACUD 7.5% HCL
Formation Treatment
Treatment Date:10/23/2003
Treatment Summary:10/21/03 PUMPED FRAC TREATMENT W/105,900 LBS OF 20/40 OTTAWA/TLC SAND AT 10.8 BPM, AVG PRESSURE AT 2,517 PSI. (STAGE 1 THRU 5) THRU 21 HOLES, 1611,1614',1582-1586',1517-1519',1526-1528',1303-1306',1253-1255'.
Tubing Size:2.875 in.Tubing Setting Depth:1684 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/23/2010Test Method:production
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 70
BTU_GAS 998
CALC_BBLS_H2O 70
CALC_MCF_GAS 28
CASING_PRESS 14
MCF_GAS 28
TUBING_PRESS 300
Perforation Data:
Interval Top:1252 ft.# Of Holes:30
Interval Bottom:1307 ft.Hole Size:0.45 in.

Formation RTON                     Formation Classification:  GW                     Status:  CM - 4/30/2014                 Interval Top: 1252 ft.    Interval Bottom: 1307 ft.

 Completed Information for Formation RATON COAL
1st Production Date:N/AChoke Size: 
Formation Name:RATON COALCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:9/17/2010
Treatment Summary:PERF'D 1252-1255 & 1304-1307- 9/16/10 1303'-1307' 200 GAL ACID 7.5% GCK 9/17/10 1252'-1255' 150 GAK IF ACUD 7.5% HCL *6 PREVIOUS HOLES PLUS 24 HOLES THIS PERF = 30 HOLES.
Formation Treatment
Treatment Date:10/23/2003
Treatment Summary:10/21/03 PUMPED FRACTURE TREATMENT W/43,500 LBS OF 20/40 OTTAWA/TLC SAND AT 10.8 BPM, AVG PRESSURE AT 2,517 PSI. (STAGE 4 THRU 5) THRU 6 HOLES, 1303-1306';1253-1255'.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:1252 ft.# Of Holes:30
Interval Bottom:1307 ft.Hole Size:0.45 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)4149
GOR
GOR DeterminationMCFE
Average BOE per Day1.963
Average MCFE per Day11.373

 Federal Financial Assurance  i 

 Tribal Well  i No