Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07794
Well Classification: CBM Status: PR - 5/1/2025
Well Name/No:VPR C #116
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:WAPITI OPERATING LLC - 10351
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/1/2025
FacilityID:265686LocationID:308305
County:LAS ANIMAS #071Location:NWSW 7 35S65W 6
Field:PURGATOIRE RIVER - #70830Elevation:7557 ft.
Basin:RATON BASIN  
Planned Location:2440FSL  887 FWLLat/Long: 37.011626 / -104.719044Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.011610 / -104.718600Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 5/1/2025             Measured TD: 2030 ft.    Vertical TD: 2030 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 5/1/2025
Wellbore Permit
Permit #:20022307 Expiration Date:1/1/2004
Proposed Depth/Form:2150 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:10/22/2003
Spud Date:5/11/2003Spud Date Is:ACTUAL
Measured TD:2030 ft.Measured PB depth:1970 ft.
True Vertical TD:2030 ft.True Vertical PB depth:1970 ft.
Log Types:ARRAY INDUCTION, EPITHERMAL NEUTRON LITHO DENSITY, CEMENT BOND LOG, AFTER FRAC, AND MUD LOG
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 260 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 85, Top: 0 ft., Bottom: 260 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2002 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 285, Top: 70 ft., Bottom: 1990 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1524 ft.NN
VERMEJO COAL1525 ft.1767 ft.NN
TRINIDAD1784 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 10/12/2010                Interval Top: 1718 ft.    Interval Bottom: 1767 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:N/AChoke Size: 
Formation Name:VERMEJO COALCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:9/19/2010
Treatment Summary:PER'D 1718'-1722',1727'-1729', 1764'-1767 9/16/10 1764'-1767' 300 GAL OF ACID 7.5 % HCL, 1727'-1729' 100 GAL OF ACID 7.5% HCL *6 PREVIOUS HOLES PLUS 36 HOLES THIS PERF = 42 HOLES
Formation Treatment
Treatment Date:10/22/2003
Treatment Summary:10/20/03 PUMPED FRACTURE TREATMENT W/ 18590 LBS OF 20/40 OTTAWA/TLC SAND AT 8.3 BPM, AVG PRESSURE AT 2215 PSI (STAGE 1-2) -6 HOLES, 1727 - 1729', 1764 -1767'.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation VRMJ.
Perforation Data:
Interval Top:1718 ft.# Of Holes:42
Interval Bottom:1767 ft.Hole Size:

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 5/1/2025                  Interval Top: 855 ft.    Interval Bottom: 1767 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:N/AChoke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:9/19/2010
Treatment Summary:PERF'D 855'-860'M 998'-1000'M 1400'-1402', 1718-1722. 1727-1729, 1764-1767' 9/19/10 1764'-1767' 300 GAL OF ACID 7.5%, 1727'-1729' 100 GAL OF ACID 7.5% HCL
Formation Treatment
Treatment Date:10/22/2003
Treatment Summary:10/20/03 PUMPED FRACTURE TREATMENT W/ 61220 LBS OF 20/40 OTTAWA/TLC SAND AT 8.3 BPM, AVG PRESSURE AT 2215 PSI (STAGE 1-5)-15 HOLES, 1764-1767', 1727-1729',1400-1402',998-1000',858-860'.
Tubing Size:2.875 in.Tubing Setting Depth:1841 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/22/2010Test Method:production
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 35
BTU_GAS 998
CALC_BBLS_H2O 35
CALC_MCF_GAS 11
CASING_PRESS 14
MCF_GAS 11
TUBING_PRESS 200
Perforation Data:
Interval Top:855 ft.# Of Holes:87
Interval Bottom:1767 ft.Hole Size:0.45 in.

Formation RTON                     Formation Classification:  GW                     Status:  CM - 4/30/2014                 Interval Top: 855 ft.    Interval Bottom: 1402 ft.

 Completed Information for Formation RATON COAL
1st Production Date:N/AChoke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:9/19/2010
Treatment Summary:PERF'D 855'-860', 998'-1000', 1400'-1402' ONLY PERF'D DID NOT PUMP ACID *9 PERVIOUS HOLES PLUS 36 HOLES THIS PERF = 45 HOLES
Formation Treatment
Treatment Date:10/22/2003
Treatment Summary:10-20-03 PUMPED FRACTURE TREATMENT WITH 42,630 LBS OF 20/40 OTTAWA/TLC SAND AT 8.3 BPM, AVG PRESSURE AT 2215 PSI (STAGE 3 - 5) THRU 9 HOLES, 1400 -1402',998-1000',858-860'.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:855 ft.# Of Holes:45
Interval Bottom:1402 ft.Hole Size:0.45 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
01/2025 - 12/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)1441
GOR
GOR DeterminationMCFE
Average BOE per Day0.688
Average MCFE per Day3.983

 Federal Financial Assurance  i 

 Tribal Well  i No