Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07779
Well Classification: CBM Status: PR - 7/12/2011
Well Name/No:GOLDEN EAGLE #27-05
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/12/2011
FacilityID:265526LocationID:308293
County:LAS ANIMAS #071Location:SWNW 27 33S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:7205 ft.
Basin:RATON BASIN  
Planned Location:1374FNL  690 FWLLat/Long: 37.146432 / -104.880940Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.146680 / -104.881350Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/13/2011
End Date: 6/13/2011
Reported: 4/16/2012
Prior to rule 205A.b.(2)(A)
Days to report: 308
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 7/12/2011             Measured TD: 1918 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 7/12/2011
Wellbore Permit
Permit #:20022194 Expiration Date:12/15/2003
Proposed Depth/Form:2800 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:2/3/2004
Spud Date:12/8/2003Spud Date Is:ACTUAL
Measured TD:1918 ft.Measured PB depth:1916 ft.
True Vertical TD:True Vertical PB depth:
Log Types:LITHO DENSITY NEUTRON,DUAL INDUCTION, CEMENT BOND
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 288 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 125, Top: 0 ft., Bottom: 288 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 1913 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 321, Top: 44 ft., Bottom: 1913 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1226 ft.NN
VERMEJO COAL1284 ft.1708 ft.NN
TRINIDAD1708 ft.1918 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 2/11/2004                 Interval Top: 1374 ft.    Interval Bottom: 1688 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:N/AChoke Size: 
Formation Name:VERMEJO COALCommingled:No
Production Method:30N-095-PC PUMP
Open Hole Completion:No
Formation Treatment
Treatment Date:2/3/2004
Treatment Summary:1681.5-88',1645-47',1635.5-39'(3 SPF,39 HOLES) FRAC 1ST STAGE:PUMPED 64,820 GAL 20# DELTA FRAC FLUID. PLACED 96,300# SAND.;1546-47.5',1513'-16',1379.5-80.5,1373.5'-74.5'(3 SPF,22 HOLES) FRAC 2ND STAGE:PUMPED 43,235 GAL 20# DELTA FRAC FLUID. 57,400# SAND
Tubing Size:2.875 in.Tubing Setting Depth:1717 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/11/2004Test Method:ORIFICE METER
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 100
BTU_GAS 1004
CALC_BBLS_H2O 100
CALC_MCF_GAS 3
CASING_PRESS 25
MCF_GAS 3
Perforation Data:
Interval Top:1374 ft.# Of Holes:61
Interval Bottom:1688 ft.Hole Size:

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 7/12/2011                 Interval Top: 408 ft.    Interval Bottom: 1688 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:7/11/2011Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:2.875 in.Tubing Setting Depth:1806 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/12/2011Test Method:Pumping
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 53
BTU_GAS 1007
CALC_BBLS_H2O 53
CALC_MCF_GAS 25
CASING_PRESS 39
MCF_GAS 25
TUBING_PRESS 1
Perforation Data:
Interval Top:408 ft.# Of Holes:115
Interval Bottom:1688 ft.Hole Size:0.46 in.

Formation RTON                     Formation Classification:  GW                     Status:  CM - 8/11/2011                 Interval Top: 408 ft.    Interval Bottom: 1176 ft.

 Completed Information for Formation RATON COAL
1st Production Date:7/11/2011Choke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/13/2011
Treatment Summary:Acidized w/1,750 gals 15% HCl acid. Frac'd w/69,234 gal 20# Delta 140 w/Sandwedge OS carrying 234,704# 16/30 Nebraska sd.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:408 ft.# Of Holes:54
Interval Bottom:1176 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)8864
GOR
GOR DeterminationMCFE
Average BOE per Day4.187
Average MCFE per Day24.287

 Federal Financial Assurance  i 

 Tribal Well  i No