Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07738
Well Classification: CBM Status: PR - 5/1/2025
Well Name/No:VPR C #110
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:WAPITI OPERATING LLC - 10351
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/1/2025
FacilityID:264834LocationID:308260
County:LAS ANIMAS #071Location:NWSW 12 35S66W 6
Field:PURGATOIRE RIVER - #70830Elevation:7638 ft.
Basin:RATON BASIN  
Planned Location:1471FSL  733 FWLLat/Long: 37.008966 / -104.737214Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.008950 / -104.737220Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 5/1/2025             Measured TD: 2120 ft.    Vertical TD: 2120 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 5/1/2025
Wellbore Permit
Permit #:20021760 Expiration Date:10/1/2003
Proposed Depth/Form:2250 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:10/31/2003
Spud Date:5/5/2003Spud Date Is:ACTUAL
Measured TD:2120 ft.Measured PB depth:2055 ft.
True Vertical TD:2120 ft.True Vertical PB depth:2055 ft.
Log Types:ARRAY INDUCTION, EPITHERMAL NEUTRON LITHO DENSITY, CEMENT BOND LOG, AFTER FRAC AND MUD LOG.
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 251 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 85, Top: 0 ft., Bottom: 251 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2082 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 317, Top: 42 ft., Bottom: 2060 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1568 ft.NN
VERMEJO COAL1569 ft.1843 ft.NN
TRINIDAD1855 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 8/20/2002                 Interval Top: 1661 ft.    Interval Bottom: 1842 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:N/AChoke Size: 
Formation Name:VERMEJO COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/31/2003
Treatment Summary:10/29/03 PUMPED FRACTURE TREATMENT W/71,330 LBS OF 20/40 OTTAWA/TLC SAND AT 12 BPM, AVG PRESSURE AT 1068 PSI(STAGE 1 & 2) THRU 12 HOLES, 1661-1665', 1838-1842'.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation VRMJ.
Perforation Data:
Interval Top:1661 ft.# Of Holes:12
Interval Bottom:1842 ft.Hole Size:

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 5/1/2025                  Interval Top: 898 ft.    Interval Bottom: 1842 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:N/AChoke Size:0.250 in.
Formation Name:RATON-VERMEJO COALSCommingled:Yes
Production Method:PUMPING CBM GAS WELL. PRODUCED WATER INJECTED IN WDW.
Open Hole Completion:No
Formation Treatment
Treatment Date:10/31/2003
Treatment Summary:10/29/03 PUMPED FRAC TREATMENT W/165,990 LBS OF 20/40 OTTAWA/TLC SAND AT 12 BPM, AVG PRESSURE AT 1068 PSI (STAGE 1 THRU 7) THRU 33 HOLES, 898-902',965-967',974-978',1472-1474',1488-1490',1661-1665',1838-1842'.
Tubing Size:2.875 in.Tubing Setting Depth:1877 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/9/2003Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 102
CALC_BBLS_H2O 102
CALC_MCF_GAS 0
CASING_PRESS 110
MCF_GAS 0
Perforation Data:
Interval Top:898 ft.# Of Holes:33
Interval Bottom:1842 ft.Hole Size:

Formation RTON                     Formation Classification:  GW                     Status:  CM - 4/30/2014                 Interval Top: 898 ft.    Interval Bottom: 1490 ft.

 Completed Information for Formation RATON COAL
1st Production Date:N/AChoke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/31/2003
Treatment Summary:10/29/03 PUMPED FRACTURE TREATMENT W/94,660 LBS OF 20/40 OTTAWA/TLC SAND AT 12 BPM, AVG PRESSURE AT 1,068 PSI(STAGE 3 THRU 7) THRU 21 HOLES, 898-902',965-967',974-978',1472-1474',1488-1490'.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:898 ft.# Of Holes:21
Interval Bottom:1490 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)9157
GOR
GOR DeterminationMCFE
Average BOE per Day4.368
Average MCFE per Day25.329

 Federal Financial Assurance  i 

 Tribal Well  i No